![]() 12/24/05 - a very nice view of what they'll look like |
![]() 12/24/05 - a nice view of the upper building's progress |
![]() 12/24/05 - the lattice with plastic is for weather protection |
![]() 12/4/05 - a closer look at the front of the upper building |
![]() 12/24/05 - upper building, side facing parking garage |
![]() 12/24/05 - the parking garage also has the weather protection |
![]() 12/24/05 - here's a look at the front of the parking garage |
![]() 12/24/05 - a busy machine, drilling the holes for pilings |
![]() 12/24/05 - the pilings for the front area of the building |
![]() 12/24/05 - pilings for the left side of the building |
![]() 12/24/05 - a better look from above at the front pilings |
![]() 12/24/05 - looking from above up towards the upper building |
![]() 12/04/05 - preparing to start on the third floor |
![]() 12/04/05 - lattice structure rests on hill behind unit |
![]() 12/04/05 - closer look at lattice, appears to be roof cover |
![]() 12/04/05 - here's one part of lattice on parking garage roof |
![]() 12/04/05 - work continues on footings for the lower building |
![]() 12/04/05 - another view of the lower building side |
![]() 12/04/05 - this is where the swimming pool used to be |
![]() 12/04/05 - a nice overview of the lower construction site |
![]() 11/20/05 - the upper unit continues to rise |
![]() 11/20/05 - workers relay concrete forms up to next floor |
![]() 11/20/05 - here's one of the parking garage stairwells |
![]() 11/20/05 - concrete pillars continue to be installed |
![]() 11/20/05 - a closer look at the pillars installed as footings |
![]() 11/20/05 - the wall being installed behind Sr NCO dorm |
![]() 11/20/05 - a look at the wall in relation to new housing |
![]() 11/20/05 - the backside of the wall shows the attractive design |
![]() 11/13/05 - here at last, the artist's concept |
![]() 11/13/05 - a wide-angle look at upper unit front |
![]() 11/13/05 - retaining wall is visible behind the upper unit |
![]() 11/13/05 - picture below was taken thru this hole located here |
![]() 11/13/05 - drawing clearly shows this is a parking garage |
![]() 11/13/05 - rear of the parking garage |
![]() 11/13/05 - second unit going in behind Sr NCO dorm |
![]() 11/13/05 - overview of lower building construction site |
![]() 11/05/05 - a look at the progress on the upper unit |
![]() 11/05/05 - a look at the front of the upper unit |
![]() 11/05/05 - the new construction are, behind Sr NCO dorm |
![]() 11/05/05 - later in the day, working in the same area |
![]() 11/05/05 - a look across the new area of construction |
![]() 11/05/05 - the pile driver is brought in for more footings |
![]() 11/05/05 - if you wondered how the crane operator gets his lunch |
![]() 11/05/05 - it's put into a bag that he hoists up on this hook |
![]() 10/30/05 - back of upper unit now visible with fence gone |
![]() 10/30/05 - a look at the front of the upper unit |
![]() 10/30/05 - the back of the lower unit, going up |
![]() 10/30/05 - the front of the lower unit showing a lot of progress |
![]() 10/30/05 - both buildings seen across the newly-cleared area |
![]() 10/15/05 - an even closer look at upper unit construction |
![]() 10/15/05 - same side with crane in background |
![]() 10/15/05 - looking back up at upper unit |
![]() 10/15/05 - new view of lower unit construction |
![]() 10/15/05 - another view looking across lower unit |
![]() 10/15/05 - a look at lower and upper units |
![]() 10/9/05 - a look at newly- expanded construction area |
![]() 10/15/05 - same area, Sr NCO dorm in background |
![]() 10/15/05 - is swimming pool grass now on Hill 170? |
![]() 10/9/05 - a closer look at upper unit construction |
![]() 10/9/05 - good view of the lower unit construction progress |
![]() 10/2/05 - the construction has risen above the fence |
![]() 10/2/05 - the pile of rubble used to be Mustang Pool |
![]() 10/2/05 - looking across what used to be Bldg 1001 |
![]() 10/2/05 - from in front of where the pool bldg used to be |
![]() 7/16/05 - compare with leaf-free view at 3/6/05 below |
![]() 6/25/05 - the utilities are laid in for the upper unit |
![]() 6/25/05 - the crane behind has started work to move materials |
![]() 6/25/05 - ground above wall was covered the next day |
![]() 6/25/05 - the foundation is set and what look like sewage or other drain pipe is being installed. The blue covering the sides is to prevent erosion from the annual monsoon, which started the next day |
|||
![]() 6/19/05 - finish and prepare for start of vertical construction |
![]() 6/19/05 - foundation forms can be seen in the background |
![]() 6/19/05 - retaining wall is nearly completed |
![]() 6/19/05 - and finishing work is being completed near the wall |
![]() 6/19/05 - a look at the site of the lower building |
![]() 6/19/05 - sorry, but this is the only way I could get a panoramic view of the two sites of the lower housing area building being built into the side of Hill 180 |
||
![]() 6/12/05 - the entrance to the construction site |
![]() 6/12/05 - a panoramic view of the foundation work on the lower building of the lower housing area. |
||
![]() 6/12/05 - construction of the retaining wall continues |
![]() 6/12/05 - foundation work continues |
![]() 5/29/05 - forms are in place for the retaining wall |
![]() 5/29/05 - the upper unit foundation work continues |
![]() 5/29/05 - the foundation for the lower unit |
![]() 5/29/05 - panoramic view of the entire area of the foundation for the lower unit |
||
![]() 4/24/05 - rock is chipped away from Hill 180 |
![]() 4/24/05 - the lower unit site also has rock to be chipped away |
![]() 4/24/05 - this machine drills holes for the foundation pylons |
![]() 4/23/05 - here are the pylons being emplaced |
![]() 3/6/05 - here is a view from the balcony of Bldg 1007 adjacent to the construction site for the new family housing being built on the side of Hill 180 |
![]() 5/7/05 - the Mustang Pool prepares for its final season |
||
![]() 3/6/05 - coming down Hill 180, here's a view of the site |
![]() 3/6/05 - the site of the former BOQ Building 1005 |
![]() 3/6/05 - This was BOQ Building 1004 |
The Mustang Pool above will be demolished to make way for the family housing being built on Hill 180. A new pool is to be built in the Mustang Valley Village expansion area. This pool has served Osan for half a century as seen in this 1958 photo. |
![]() 2/12/05 - BOQ Building 1003 is a shell of its former self |
![]() 1/30/05 - not much remains of BOQ Building 1005 |
![]() 1/30/05 - BOQ Building 1004 is being gutted for demolition |
![]() 1/30/05 - BOQ Building 1003 is being emptied out |
![]() 1/22/05 - family housing site preparation begins with fence |
![]() 1/22/05 - the wading pool (left) is spared for this year |
![]() 1/15/05 - demarcation of the construction site begins |
![]() 1/15/05 - BOQ Building 1003 falls within the construction area |
![]() 11/28/03 - looking at site from officers dorm bldg 736 |
![]() 11/28/03 - a view of the site from hospital parking area |
![]() 5/31/03 - future construction site as seen from Hill 170 |
|
![]() |
|||