2006 Family Housing - Phase 2

Osan Housing Photo
12/31/06 - long view of the entire building
Osan Housing Photo
12/31/06 - painting, with dark upper and lower bands
Osan Housing Photo
12/31/06 - lattice-work continues to envelope building
Osan Housing Photo
12/31/06 - machinery inside the plant area below apartments
Osan Housing Photo
12/31/06 - first parking garage adds finishing touches
Osan Housing Photo
12/31/06 - view of lower building from near upper
Osan Housing Photo
12/31/06 - work continues above eleventh floor
 
Osan Housing Photo
11/26/06 - construction at top of upper building
Osan Housing Photo
11/26/06 - hillside erosion control nearly complete (again)
Osan Housing Photo
11/26/06 - entrance to upper building from Pilsung Rd.
Osan Housing Photo
11/25/06 - view of the back shows painting started
Osan Housing Photo
11/26/06 - lower building as seen coming from main gate
Osan Housing Photo
11/26/06 - eleventh floor is now being constructed
Osan Housing Photo
11/26/06 - a view of the rear of the lower building
Osan Housing Photo
11/26/06 - view of both building looking across from Hill 170
Osan Housing Photo
11/11/06 - view of upper building through autumn colors
Osan Housing Photo
11/11/06 - stucco covers all foam insulation except at top
Osan Housing Photo
11/11/06 - repairing hillside again after heavy rain
Osan Housing Photo
11/11/06 - view of housing from officers dorm bldg 929
Osan Housing Photo
11/11/06 - rear of parking garage gets paint job
Osan Housing Photo
11/11/06 - paint has been applied only to first garage
Osan Housing Photo
11/11/06 - front area of parking garages still unpainted
Osan Housing Photo
11/11/06 - lower building up 10 floors, 3 to go
Osan Housing Photo
10/21/06 - view of upper building from across the base
Osan Housing Photo
10/21/06 - a closer look coming down Hill 180
Osan Housing Photo
10/21/06 - workmen here are completing stucco application
Osan Housing Photo
10/21/06 - retaining wall around front of structure
Osan Housing Photo
10/21/06 - looking over new retaining wall at parking garage
Osan Housing Photo
10/21/06 - sides of two parking garages along Pilsung Rd
Osan Housing Photo
10/21/06 - a distant look at the future 13-story building at left
Osan Housing Photo
10/21/06 - here's the current state of building construction
Osan Housing Photo
10/15/06 - most styrofoam insulation now covered by stucco
Osan Housing Photo
10/15/06 - erosion control structure still being rebuilt
Osan Housing Photo
10/15/06 - still a lot of holes where the windows will go
Osan Housing Photo
10/15/06 - retaining wall around front of structure
Osan Housing Photo
10/15/06 - even the parking garage is being insulated
Osan Housing Photo
10/15/06 - the lower unit is now up to the ninth floor
Osan Housing Photo
10/15/06 - first view coming from the main gate
 
Osan Housing Photo
9/02/06 - more exterior work being done in this overview
Osan Housing Photo
9/02/06 - styrofoam installation continues upward
Osan Housing Photo
9/02/06 - below first residential floor is space for HVAC, etc.
Osan Housing Photo
9/02/06 - extensive latticework at rear for worker access ramps
Osan Housing Photo
9/02/06 - next floor of parking garage is being framed
Osan Housing Photo
9/02/06 - a view of the parking garage opposite side
Osan Housing Photo
9/02/06 - the lower building also has floor numbering added
Osan Housing Photo
9/02/06 - the lower building gets an elevator, lucky guys
Osan Housing Photo
8/19/06 - a lot of work still continuing at the top
Osan Housing Photo
8/19/06 - styrofoam insulation is going on over the concrete
Osan Housing Photo
8/19/06 - more of the styrofoam going on at this side
Osan Housing Photo
8/19/06 - yup, balconies being installed as noted below
Osan Housing Photo
8/13/06 - a look at the upper building as work continues on top
Osan Housing Photo
8/13/06 - upper two floors are smaller than floor below
Osan Housing Photo
8/13/06 - top floor is further reduced from floor below it
Osan Housing Photo
8/13/06 - workers may be starting to install balconies here
Osan Housing Photo
8/13/06 - new sidewalk extends the length of both garages
Osan Housing Photo
8/13/06 - looking at parking garage entrances
Osan Housing Photo
8/13/06 - looking across the back of the lower building
 
Osan Housing Photo
8/05/06 - an overview of the lower building adding next floor
Osan Housing Photo
8/05/06 - looking up the side of the lower building
Osan Housing Photo
8/05/06 - parking garages continue to show improvement
Osan Housing Photo
8/05/06 - looking over the parking garages at upper unit
Osan Housing Photo
8/05/06 - construction work continues at the top
Osan Housing Photo
8/05/06 - many more windows installed since last time
Osan Housing Photo
8/05/06 - erosion control devices damaged by monsoon
Osan Housing Photo
8/05/06 - cleaning up mud that flowed over much of Osan
Osan Housing Photo
7/22/06 - overview of upper building through morning mist
Osan Housing Photo
7/22/06 - not much progress on the windows since our last look
Osan Housing Photo
7/22/06 - but busy worker here means work goes on inside
Osan Housing Photo
7/22/06 - looking up at the side of the imposing structure
Osan Housing Photo
7/22/06 - the right side of the lower parking garage
Osan Housing Photo
7/22/06 - the left side of the lower parking garage
Osan Housing Photo
7/22/06 - current view of the lower family housing building
Osan Housing Photo
7/22/06 - the side of the lower family housing building
Osan Housing Photo
7/08/06 - here's a look at the upper building
Osan Housing Photo
7/08/06 - workers on the top complete the elevator shafts
Osan Housing Photo
7/08/06 - look back at upper building from downhill side
7/08/06 - the upper building is a ten-story building, but if you look at the first picture in this row, there are nine stories visible. Because of the downhill slope, the first floor is only visible from the downhill side, as shown in the picture to the left
Osan Housing Photo
6/25/06 - 2nd garage, back of first floor lower than roadway
Osan Housing Photo
6/25/06 - looking across front side facing hospital
Osan Housing Photo
6/25/06 - fourth floor, forms still in place, being finished
Osan Housing Photo
6/25/06 - at the back, looking towards upper building
Osan Housing Photo
6/25/06 - ninth top floor of upper building, forms still in place
Osan Housing Photo
6/25/06 - just a few windows installed, many more to go
Osan Housing Photo
6/25/06 - balconies with a view overlooking heart of Osan AB
Osan Housing Photo
6/11/06 - trying to get width of lower building in single image
Osan Housing Photo
6/11/06 - forms in place for the first level walls
Osan Housing Photo
6/11/06 - here's a view of the full width of upper building
Osan Housing Photo
6/11/06 - nine ten floors up, starting on 10th and final work
Osan Housing Photo
6/03/06 - upper building eighth floor forms still in place
Osan Housing Photo
6/03/06 - scaffolding for ninth floor started
Osan Housing Photo
6/03/06 - an imposing sight taking over Hill 180 view
Osan Housing Photo
6/03/06 - looking across second parking garage construction
Osan Housing Photo
6/03/06 - from this view, looks like three floors completed
Osan Housing Photo
6/03/06 - from above and behind, two floors are completed; the lowest floor in view at left is probably for utilities
Osan Housing Photo
5/27/06 - upper building on a rainy Saturday
Osan Housing Photo
5/27/06 - looking up, with rain spot on the lens
Osan Housing Photo
5/27/06 - the framing for covers is gone from back slope
Osan Housing Photo
5/27/06 - one of the frames with covering on parking garage
Osan Housing Photo
5/27/06 - a panoramic view of the construction of the lower building of family housing

Osan Housing Photo
5/27/06 - view of lower building across new parking garage site
Osan Housing Photo
5/27/06 - a panoramic view of the second parking garage going up at the corner of Songtan Blvd and Pilsung Rd
 
Osan Housing Photo
5/13/06 - a look at both of the family housing buildings
Osan Housing Photo
5/13/06 - 7-up, eighth floor forms being installed
Osan Housing Photo
5/13/06 - crane moves more equipment to the eighth floor
Osan Housing Photo
5/13/06 - upper unit view with sign in foreground
Osan Housing Photo
5/13/06 - the lower building construction moves along
Osan Housing Photo
5/13/06 - a view of the building's left side
Osan Housing Photo
5/13/06 - looking down at the building from above
Osan Housing Photo
5/13/06 - another view with upper building in background
Osan Housing Photo
4/22/06 - the foundation of the second parking garage
Osan Housing Photo
4/22/06 - last week, a foundation; this week, first floor
Osan Housing Photo
4/22/06 - from the other side, work progressing smartly
Osan Housing Photo
4/22/06 - a somewhat crooked look over the construction site
Osan Housing Photo
4/16/06 - man in blue mask said, "no picture" – too late
Osan Housing Photo
4/16/06 - looks like foundation is nearly done, first floor soon
Osan Housing Photo
34/16/06 - a look across lower work site to upper building
 
Osan Housing Photo
3/18/06 - five floors have been completed, halfway there
Osan Housing Photo
3/18/06 - closer look shows two panels in place for sixth floor
Osan Housing Photo
3/18/06 - crane is swinging a load into position for workers
Osan Housing Photo
3/18/06 - a look at the side facing the parking garage
Osan Housing Photo
3/18/06 - full construction site for second parking garage

Osan Housing Photo
3/18/06 - retaining wall between parking garages and street
Osan Housing Photo
3/18/06 - from hospital side, foundation work continues
Osan Housing Photo
3/18/06 - another view of the foundation work
Osan Housing Photo
3/18/06 - looking down at the front construction area
Osan Housing Photo
3/18//06 - looking across at the rear construction area
Osan Housing Photo
3/18/06 - contruction is at the bottom of Hill 180
Osan Housing Photo
3/18/06 - retaining walls are critical to prevent erosion
   
Osan Housing Photo
2/25/06 - looking down at the upper building from Hill 180
Osan Housing Photo
2/25/06 - a closer look at the upper building
Osan Housing Photo
2/25/06 - at upper left, workers build scaffolding for next floor
Osan Housing Photo
2/25/06 - a new retaining wall is added near upper bulding
Osan Housing Photo
2/25/06 - a wide look at the area of the second parking garage,
according to the artist's concept drawing
Osan Housing Photo
2/25/06 - something (concrete) old, something (concrete) new
Osan Housing Photo
2/25/06 - and a closer look at the new building progress
Osan Housing Photo
2/25/06 - looking down from the opposite side
Osan Housing Photo
2/25/06 - finishing touches on another retaining wall
 
Osan Housing Photo
2/18/06 - the upper unit continues to head skyward
Osan Housing Photo
2/18/06 - construction in front of parking garage will be a second parking garage,
according to the artist's concept drawing
Osan Housing Photo
1/30/06 - a look at the progress of the foundation work
Osan Housing Photo
1/30/06 - a closer look a the new building's front area
Osan Housing Photo
1/30/06 - and a closer look at the new building's rear area
Osan Housing Photo
1/30/06 - a long view of the upper family housing building
Osan Housing Photo
1/14/06 - an updated look at progress on upper building
Osan Housing Photo
1/14/06 - workers extend framework to start on next floor
Osan Housing Photo
1/14/06 - the other area is covered to protect from weather
 
Osan Housing Photo
1/14/06 - another look at the front of the parking garage
Osan Housing Photo
1/14/06 - a worker has decided to do a practical test
Osan Housing Photo
1/14/06 - a trench to install what looked like comm pipes
Osan Housing Photo
1/14/06 - a look across the area of new building construction
Osan Housing Photo
1/08/06 - the front and right side of the upper building
Osan Housing Photo
1/08/06 - the left side of the upper building
Osan Housing Photo
1/08/06 - a look at the upper building from below
Osan Housing Photo
1/08/06 - check out the status of parking garage construction
Osan Housing Photo
1/08/06 - construction across the front of the lower area
Osan Housing Photo
1/08/06 - looks like construction for drainage
Osan Housing Photo
1/08/06 - from below, the piling appear to be all in place
Osan Housing Photo
1/08/06 - from above, the pilings cover a large area
Valid XHTML 1.1!