![]() 12/31/06 - long view of the entire building |
![]() 12/31/06 - painting, with dark upper and lower bands |
![]() 12/31/06 - lattice-work continues to envelope building |
![]() 12/31/06 - machinery inside the plant area below apartments |
![]() 12/31/06 - first parking garage adds finishing touches |
![]() 12/31/06 - view of lower building from near upper |
![]() 12/31/06 - work continues above eleventh floor |
|
![]() 11/26/06 - construction at top of upper building |
![]() 11/26/06 - hillside erosion control nearly complete (again) |
![]() 11/26/06 - entrance to upper building from Pilsung Rd. |
![]() 11/25/06 - view of the back shows painting started |
![]() 11/26/06 - lower building as seen coming from main gate |
![]() 11/26/06 - eleventh floor is now being constructed |
![]() 11/26/06 - a view of the rear of the lower building |
![]() 11/26/06 - view of both building looking across from Hill 170 |
![]() 11/11/06 - view of upper building through autumn colors |
![]() 11/11/06 - stucco covers all foam insulation except at top |
![]() 11/11/06 - repairing hillside again after heavy rain |
![]() 11/11/06 - view of housing from officers dorm bldg 929 |
![]() 11/11/06 - rear of parking garage gets paint job |
![]() 11/11/06 - paint has been applied only to first garage |
![]() 11/11/06 - front area of parking garages still unpainted |
![]() 11/11/06 - lower building up 10 floors, 3 to go |
![]() 10/21/06 - view of upper building from across the base |
![]() 10/21/06 - a closer look coming down Hill 180 |
![]() 10/21/06 - workmen here are completing stucco application |
![]() 10/21/06 - retaining wall around front of structure |
![]() 10/21/06 - looking over new retaining wall at parking garage |
![]() 10/21/06 - sides of two parking garages along Pilsung Rd |
![]() 10/21/06 - a distant look at the future 13-story building at left |
![]() 10/21/06 - here's the current state of building construction |
![]() 10/15/06 - most styrofoam insulation now covered by stucco |
![]() 10/15/06 - erosion control structure still being rebuilt |
![]() 10/15/06 - still a lot of holes where the windows will go |
![]() 10/15/06 - retaining wall around front of structure |
![]() 10/15/06 - even the parking garage is being insulated |
![]() 10/15/06 - the lower unit is now up to the ninth floor |
![]() 10/15/06 - first view coming from the main gate |
|
![]() 9/02/06 - more exterior work being done in this overview |
![]() 9/02/06 - styrofoam installation continues upward |
![]() 9/02/06 - below first residential floor is space for HVAC, etc. |
![]() 9/02/06 - extensive latticework at rear for worker access ramps |
![]() 9/02/06 - next floor of parking garage is being framed |
![]() 9/02/06 - a view of the parking garage opposite side |
![]() 9/02/06 - the lower building also has floor numbering added |
![]() 9/02/06 - the lower building gets an elevator, lucky guys |
![]() 8/19/06 - a lot of work still continuing at the top |
![]() 8/19/06 - styrofoam insulation is going on over the concrete |
![]() 8/19/06 - more of the styrofoam going on at this side |
![]() 8/19/06 - yup, balconies being installed as noted below |
![]() 8/13/06 - a look at the upper building as work continues on top |
![]() 8/13/06 - upper two floors are smaller than floor below |
![]() 8/13/06 - top floor is further reduced from floor below it |
![]() 8/13/06 - workers may be starting to install balconies here |
![]() 8/13/06 - new sidewalk extends the length of both garages |
![]() 8/13/06 - looking at parking garage entrances |
![]() 8/13/06 - looking across the back of the lower building |
|
![]() 8/05/06 - an overview of the lower building adding next floor |
![]() 8/05/06 - looking up the side of the lower building |
![]() 8/05/06 - parking garages continue to show improvement |
![]() 8/05/06 - looking over the parking garages at upper unit |
![]() 8/05/06 - construction work continues at the top |
![]() 8/05/06 - many more windows installed since last time |
![]() 8/05/06 - erosion control devices damaged by monsoon |
![]() 8/05/06 - cleaning up mud that flowed over much of Osan |
![]() 7/22/06 - overview of upper building through morning mist |
![]() 7/22/06 - not much progress on the windows since our last look |
![]() 7/22/06 - but busy worker here means work goes on inside |
![]() 7/22/06 - looking up at the side of the imposing structure |
![]() 7/22/06 - the right side of the lower parking garage |
![]() 7/22/06 - the left side of the lower parking garage |
![]() 7/22/06 - current view of the lower family housing building |
![]() 7/22/06 - the side of the lower family housing building |
![]() 7/08/06 - here's a look at the upper building |
![]() 7/08/06 - workers on the top complete the elevator shafts |
![]() 7/08/06 - look back at upper building from downhill side |
7/08/06 - the upper building is a ten-story building, but if you look at the first picture in this row, there are nine stories visible. Because of the downhill slope, the first floor is only visible from the downhill side, as shown in the picture to the left |
![]() 6/25/06 - 2nd garage, back of first floor lower than roadway |
![]() 6/25/06 - looking across front side facing hospital |
![]() 6/25/06 - fourth floor, forms still in place, being finished |
![]() 6/25/06 - at the back, looking towards upper building |
![]() 6/25/06 - |
![]() 6/25/06 - just a few windows installed, many more to go |
![]() 6/25/06 - balconies with a view overlooking heart of Osan AB |
|
![]() 6/11/06 - trying to get width of lower building in single image |
![]() 6/11/06 - forms in place for the first level walls |
![]() 6/11/06 - here's a view of the full width of upper building |
![]() 6/11/06 - |
![]() 6/03/06 - upper building eighth floor forms still in place |
![]() 6/03/06 - scaffolding for ninth floor started |
![]() 6/03/06 - an imposing sight taking over Hill 180 view |
|
![]() 6/03/06 - looking across second parking garage construction |
![]() 6/03/06 - from this view, looks like three floors completed |
![]() 6/03/06 - from above and behind, two floors are completed; the lowest floor in view at left is probably for utilities |
|
![]() 5/27/06 - upper building on a rainy Saturday |
![]() 5/27/06 - looking up, with rain spot on the lens |
![]() 5/27/06 - the framing for covers is gone from back slope |
![]() 5/27/06 - one of the frames with covering on parking garage |
![]() 5/27/06 - a panoramic view of the construction of the lower building of family housing |
![]() 5/27/06 - view of lower building across new parking garage site |
||
![]() 5/27/06 - a panoramic view of the second parking garage going up at the corner of Songtan Blvd and Pilsung Rd |
|||
![]() 5/13/06 - a look at both of the family housing buildings |
![]() 5/13/06 - 7-up, eighth floor forms being installed |
![]() 5/13/06 - crane moves more equipment to the eighth floor |
![]() 5/13/06 - upper unit view with sign in foreground |
![]() 5/13/06 - the lower building construction moves along |
![]() 5/13/06 - a view of the building's left side |
![]() 5/13/06 - looking down at the building from above |
![]() 5/13/06 - another view with upper building in background |
![]() 4/22/06 - the foundation of the second parking garage |
![]() 4/22/06 - last week, a foundation; this week, first floor |
![]() 4/22/06 - from the other side, work progressing smartly |
![]() 4/22/06 - a somewhat crooked look over the construction site |
![]() 4/16/06 - man in blue mask said, "no picture" – too late |
![]() 4/16/06 - looks like foundation is nearly done, first floor soon |
![]() 34/16/06 - a look across lower work site to upper building |
|
![]() 3/18/06 - five floors have been completed, halfway there |
![]() 3/18/06 - closer look shows two panels in place for sixth floor |
![]() 3/18/06 - crane is swinging a load into position for workers |
![]() 3/18/06 - a look at the side facing the parking garage |
![]() 3/18/06 - full construction site for second parking garage |
![]() 3/18/06 - retaining wall between parking garages and street |
||
![]() 3/18/06 - from hospital side, foundation work continues |
![]() 3/18/06 - another view of the foundation work |
![]() 3/18/06 - looking down at the front construction area |
![]() 3/18//06 - looking across at the rear construction area |
![]() 3/18/06 - contruction is at the bottom of Hill 180 |
![]() 3/18/06 - retaining walls are critical to prevent erosion |
||
![]() 2/25/06 - looking down at the upper building from Hill 180 |
![]() 2/25/06 - a closer look at the upper building |
![]() 2/25/06 - at upper left, workers build scaffolding for next floor |
![]() 2/25/06 - a new retaining wall is added near upper bulding |
![]() 2/25/06 - a wide look at the area of the second parking garage, according to the artist's concept drawing |
![]() 2/25/06 - something (concrete) old, something (concrete) new |
||
![]() 2/25/06 - and a closer look at the new building progress |
![]() 2/25/06 - looking down from the opposite side |
![]() 2/25/06 - finishing touches on another retaining wall |
|
![]() 2/18/06 - the upper unit continues to head skyward |
![]() 2/18/06 - construction in front of parking garage will be a second parking garage, according to the artist's concept drawing |
||
![]() 1/30/06 - a look at the progress of the foundation work |
![]() 1/30/06 - a closer look a the new building's front area |
![]() 1/30/06 - and a closer look at the new building's rear area |
![]() 1/30/06 - a long view of the upper family housing building |
![]() 1/14/06 - an updated look at progress on upper building |
![]() 1/14/06 - workers extend framework to start on next floor |
![]() 1/14/06 - the other area is covered to protect from weather |
|
![]() 1/14/06 - another look at the front of the parking garage |
![]() 1/14/06 - a worker has decided to do a practical test |
![]() 1/14/06 - a trench to install what looked like comm pipes |
![]() 1/14/06 - a look across the area of new building construction |
![]() 1/08/06 - the front and right side of the upper building |
![]() 1/08/06 - the left side of the upper building |
![]() 1/08/06 - a look at the upper building from below |
![]() 1/08/06 - check out the status of parking garage construction |
![]() 1/08/06 - construction across the front of the lower area |
![]() 1/08/06 - looks like construction for drainage |
![]() 1/08/06 - from below, the piling appear to be all in place |
![]() 1/08/06 - from above, the pilings cover a large area |
![]() |
|||