![]() 3/11/09 - the Phase 3 Senior Officer housing unit construction is complete and ready for occupancy. This completes photo coverage of this construction project. |
|||
![]() 3/11/09 - each side of Phase 3 looks like this |
![]() 3/11/09 - a view looking across the front of Phase 3 |
![]() 3/11/09 - landscaping is completed around storm drain |
![]() 3/11/09 - a look at Phase 3 on Hill 180 road from hospital side |
![]() 2/07/09 - the runoff conduit from Hill 180 looks complete |
![]() 2/07/09 - the concrete previously covered is now exposed to the weather and the landscaping has been pretty much finished |
||
![]() 1/17/09 - the plastic tents have returned to cover what looks like more concrete work. The panoramic view shows the full extent of this family housing project. |
|||
![]() 12/14/08 - I though the Boy Scouts had set up plastic tents here but it was just protection to keep fresh concrete from freezing |
![]() 12/14/08 - sidewalk repair even got it's own electric heater |
||
![]() 12/04/08 - the exterior of the building has been just about finished and lights can be seen inside as work goes on there |
|||
![]() 11/11/08 - the inner lining of the roof has been installed and the second floor looks like it's been painted |
![]() 11/11/08 - this part of drainage system appears complete now |
||
![]() 10/31/08 - an updated view on the progress of construction on the newest family housing for senior personnel |
![]() 10/31/08 - an overview from nearby housing |
||
![]() 10/05/08 - the contruction progess is evident and resulting from good weather. They should be able to focus on inside work by the time cold weather arrives. |
![]() 10/03/08 - update view coming down Hill 180 |
||
![]() 9/14/08 - this photo taken only a day after the 9/14 photo shows a dramatic improvement in the weather and visibility |
At this stage of the construction, the Phase 3 family housing project is looking very much like the Senior Officer housing built further up Hill 180 as shown in this photo taken at about the same stage in construction on Oct 8, 2005. |
![]() 9/14/08 - here's Phase 3 site viewed coming down Hill 180 |
|
![]() 9/13/08 - this picture shows the Phase 3 construction site on a dreary, foggy day. Photo taken 9/14 above is the same, but in better weather |
|||
![]() 9/07/08 - a very busy construction site taking advantage of good weather after the worksite has dried out from previous rainfall |
|||
![]() 8/24/08 - two workers at the left continue to work on the drainage (actually one worker and one supervisor) while the others work on the main building construction and various other tasks |
|||
![]() 8/24/08 - a look down at the right side of the site |
![]() 8/24/08 - two workers are visible, but can you find them? |
The two photos at the left were taken from a point on Hill 180 above the worksite. Foliage blocks much of the view now, but it should provide a good view from above after the leaves fall. | |
![]() 8/16/08 - here's an updated look at the construction site after a night of rain. First order of business is to dry out the worksite |
|||
![]() 8/03/08 - considerable change has occurred since the last photo with lots of new materials it's clearer now that it has been identified as the third phase of Family Housing |
![]() 8/03/08 - a view of the site from the upper building side |
||
![]() 8/03/08 - a sign has finally been added and now we know |
![]() 7/13/08 - workers inspect effects of heavy rainfall |
![]() 7/13/08 - water drains from the construction site |
![]() 7/13/08 - new storm drain seems to have done its job |
![]() 6/28/08 - the construction near upper building has started and looks like a building rather than recreation area |
![]() 6/28/08 - closer look at the contruction activity at center |
![]() 6/28/08 - storm drain construction continues |
|
![]() 6/08/08 - it looks like the workmen have returned and construction has restarted with workmen in a hole at the right while two supervise |
![]() 6/08/08 - closer look at the sign on the truck in photo at left |
||
![]() 5/25/08 - not much progress appears to have taken place since the image of this area on 5/10 |
|||
![]() 5/25/08 - another view of the raised section of the area |
![]() 5/25/08 - Vet Clinic had set varmint trap nearby |
![]() 5/25/08 - work continues to finish storm drain system |
|
![]() 5/10/08 - a novel view of what's likely to be the picnic area above the family housing, this is a view from above the site, with the officers dormitory area across the road |
|||
![]() 5/10/08 - new drain between rec area and family housing |
![]() 5/10/08 - two sharp turns could overflow in monsoon |
![]() 5/10/08 - additional Hill 180 runoff joins next to main flow |
![]() 5/10/08 - this should be interesting spot during monsoon |
![]() 5/04/08 - the area where the exposed rock was showing in the previous photo is being covered. Area is looking suspiciously like it might be a replacement for the now-disappeared picnic area |
|||
![]() 2/01/08 - here's an updated look at the construction going on up the hill from the new family housing |
|||
![]() 2/01/08 - the construction area has added some depth, into Hill 180 rock with a concrete coating on the bottom. |
![]() 2/01/08 - a better look at the bottom concrete coating |
||
![]() 2/01/08 - what came out of the hole in photo above |
![]() 1/05/08 - here's an updated look at the construction going on up the hill from the new family housing |
||
![]() 12/23/07 - the construction continues going on up Hill 180 past the upper housing building. Could it be a replacement for the picnic area? |
|||
![]() 11/24/07 - the work on the wall surround this area continues, with no indication yet of what will go into the relatively flat space. |
|||
![]() 11/17/07 - an updated view of the construction adjacent to the upper family housing building on Hill 180. |
|||
![]() 10/27/07 - the retaining wall postulated in the previous post is now taking shape. So, now what will go into the relatively flat space? |
|||
![]() 9/16/07 - the construction continues next to the upper building. There's a foundation going in at the left side. |
|||
![]() 9/08/07 - a construction update on the Hill 180 site next to Family Housing. Markings on the ground at the left indicate that's where construction will probably start. |
|||
![]() 8/18/07 - here's a nice panoramic update of the construction next to the upper building of the family housing. It's been flattened so that a building of some type will probably go here. |
|||
![]() 7/15/07 - coming down Hill 180, a new construction fence |
![]() 7/15/07 - this used to be a picnic area, and now looks like it will be serving a new role, probably in support of the adjacent new family housing |
||
![]() 8/03/07 - an updated look at the construction next to the upper family housing building |
![]() 6/25/06 - mini-park is back to original configuration |
![]() 6/03/06 - mini-park near upper unit looks destined for new role |
|
![]() 1/30/06 - here's a wider view of the area showing demarcation tapes extending through a large part of the wooded area. |
|||
![]() 1/27/06 - it looks like picnic area may be seeing some changes |
![]() 1/27/06 - will it become a larger family recreation area? |
![]() 12/21/02 - looking down Hill 180 at future construction site |
|
![]() |
|||