Morale, Welfare and Recreation

New Challenger Enlisted Club

New Enlisted Club Construction Photo
04/12/12 - a better night view of the club taken at early dawn with all lights lit.The lights to the left are family housing tower and
parking garage, at right is Community Center. For the best view of this image, try the high resolution version (5.8MB).
New Enlisted Club Construction Photo
04/04/12 - let the planting begin and it starting to look better and better.
The evergreens in this photo took a beating from high winds today.
New Enlisted Club Construction Photo
03/30/12 - a night view of the new club with lights installed and working gives you an idea
of how the club will appear as you approach it to partake of its offerings
New Enlisted Club Construction Photo
03/28/12 - closer and closer to completion as much of work is now outside. The pile of topsoil at the
left in the driveway is on a tarp to prevent 'contaminating' driveway work
New Enlisted Club Construction Photo
03/28/12 - a view across the front from the right side
New Enlisted Club Construction Photo
03/28/12 - looking from sidewalk on Community Center side
New Enlisted Club Construction Photo
03/28/12 - bases for the lights to go in around driveway
New Enlisted Club Construction Photo
03/28/12 - looking over bases at front entrance
New Enlisted Club Construction Photo
03/28/12 - more bases and installed lights
New Enlisted Club Construction Photo
03/28/12 - closer look at topsoil pile and workers near bldg
New Enlisted Club Construction Photo
03/28/12 - a look the front from the officers club side
New Enlisted Club Construction Photo
03/28/12 - and a look at the lights along the right side
New Enlisted Club Construction Photo
02/21/12 - the front of the construction site is now clear and all fencing has been removed
so here's the first full panoramic view of the front of the club
New Enlisted Club Construction Photo New Enlisted Club Construction Photo
02/16/12 - a new concrete sidewalk curving up to the front entrance has been poured and covered by blue tarp to cure
New Enlisted Club Construction Photo
02/10/12 - an updated look at the side of the club with a lot of construction materials around, so there's much yet to be done
New Enlisted Club Construction Photo
02/10/12 - the left side of the club looking very much the same as the previous image, but with more 'stuff' in front
New Enlisted Club Construction Photo
02/10/12 - the right side of the club, also looking much the same as the previous image
New Enlisted Club Construction Photo
02/10/12 - supports over drainage at driveway exit
New Enlisted Club Construction Photo
02/10/12 - supports over drainage at driveway entrance
New Enlisted Club Construction Photo
12/31/11 - an updated view of the back of the club on New Years Eve
with more of the final stages of contstruction visible.
New Enlisted Club Construction Photo
12/31/11 - an updated view of the back of the club on New Years Eve
with more of the final stages of contstruction visible.
New Enlisted Club Construction Photo
12/31/11 - the left side of the club where much of the construction equipment is visible
and part of the sidewalk in front of streetside parking.
New Enlisted Club Construction Photo
12/31/11 - an updated view of the left front of the club
and part of the driveway coming from front entrance.
New Enlisted Club Construction Photo
12/31/11 - an updated view of the right front of the club
and part of the driveway going up to the front entrance.
New Enlisted Club Construction Photo
12/31/11 - an updated view of the right side of the club
with large glass windows and decorative lights.
New Enlisted Club Construction Photo
12/31/11 - a view across the front from the left side
New Enlisted Club Construction Photo
12/31/11 - a better view of the driveway leading to front
New Enlisted Club Construction Photo
12/31/11 - a better look at the lights at the right side
New Enlisted Club Construction Photo
12/31/11 - closeup of the entrance on the right side
New Enlisted Club Construction Photo
12/02/11 - an updated view of the back of the new club with more changes evident
as the building gets closer and closer to its final image.
New Enlisted Club Construction Photo
12/02/11 - this updated side view of the club shows further progress
and the removal of the construction fence reveals the new streetside parking area.
New Enlisted Club Construction Photo
12/02/11 - a look at the left side front of the club with driveway under construction.
New Enlisted Club Construction Photo
12/02/11 - a look at the right side front of the club.
New Enlisted Club Construction Photo
11/15/11 - here's another view of the front of the new club. The steel fencing has been removed
giving me a chance to get this view before the shorter, cloth fencing at left is completed.
New Enlisted Club Construction Photo
11/08/11 - some of the fencing was removed from the front of the club construction giving us a pretty good idea
of what the front of the club will look like when completed. (Nice double image of front-end loader, too.)
New Enlisted Club Construction Photo
10/28/11 - a lot of finishing work has taken place on the back of the new club with more great weather.
Construction completion forecast for Mar 2012, interior furnishing and setup estimated complete about Jun 2012.
New Enlisted Club Construction Photo
9/20/11 - with the cool, low-humidity early autumn weather, the time is right
for an update of the new club construction against a beautiful blue sky with flecks of clouds.
New Enlisted Club Construction Photo
9/20/11 - fancy stonework decorating the side
New Enlisted Club Construction Photo
9/20/11 - another look at the front of the club from the Community Center side
New Enlisted Club Construction Photo
8/28/11 - here's a look at the back of the new club to see the progress on construction
on one of the rare rain-free days of this summer when the weather was tolerable.
New Enlisted Club Construction Photo
8/07/11 - my excuse this time is that it's just been too hot to go out in the midday sun
so this time I took the camera with me for an early morning walk. You can see the sunrise behind at right.
New Enlisted Club Construction Photo
8/07/11 - an updated view of the side of the club from the Officers Club side
New Enlisted Club Construction Photo
8/07/11 - this is a first-time look at the front of the club from the Community Center side
New Enlisted Club Construction Photo
7/20/11 - it's been awhile since I got the camera out and got an update image for you to view. Busy time what with moving
and then monsoon. For the higest resolution image (2.6MB), click here.
New Enlisted Club Construction Photo
7/19/11 - ground level view from the Community Center
New Enlisted Club Construction Photo
7/19/11 - a view of the entrance to the construction site
New Enlisted Club Construction Photo
7/19/11 - here's a view of the side of the club from the hillside in front of the Officers Club
New Enlisted Club Construction Photo
5/17/11 - two days after taking the below image, here's a side view from in front of the Officer's Club.
For the higest resolution image (3.5MB), click here.
New Enlisted Club Construction Photo
5/15/11 - here's a full width, full height update view of the new club taken on a beautiful Sunday as roofing was being put on the
highest part of the club.The crane moved while I was switching from camera internal to external memory.
For a higher resolution image, click here. Disconnects in stitching due to memory changeover are more evident in this image.
New Enlisted Club Construction Photo
4/30/11 - here's a full width, full height view of the new club
taken on a rainy Saturday when there was no work being done
New Enlisted Club Construction Photo
4/05/11 - the remainder of the roof girders have been emplaced
New Enlisted Club Construction Photo
3/22/11 - this is the current state of construction of the new club
as seen from the Officers Club parking lot
New Enlisted Club Construction Photo
3/10/11 - this is a full view combining the upper and lower images seen below.
I found a new (to me) program (autostitch) that make panoramic images a breeze. Stitching is seamless.
New Enlisted Club Construction Photo
3/10/11 - this is the upper part of the new club in this view from the Personnel building.
It has become too high to take the height in one from this location
New Enlisted Club Construction Photo
3/10/11 - this is the lower part of the building viewed from the same second floor location.
An attempt to create a double high image by 'sewing' the two images together was not successful.
New Enlisted Club Construction Photo
12/21/10 - asphalt is piled by the roadway with care
New Enlisted Club Construction Photo
12/21/10 - in hope that a pickup soon will be there
New Enlisted Club Construction Photo
12/21/10 - moving the asphalt to the work site
New Enlisted Club Construction Photo
12/21/10 - asphalt is dumped and back for more
New Enlisted Club Construction Photo
12/21/10 - asphalt is piled by the roadway with care
New Enlisted Club Construction Photo
12/21/10 - from O'Club, a look at new enlisted club
New Enlisted Club Construction Photo
12/21/10 - the construction has closed the side road
← Across from construction site, a ROKAF-built monument is ready to be dedicated. I'll try to get details in a future 'Feedback from Jack' entry.
New Enlisted Club Construction Photo
12/18/10 - asphalt is piled by the roadway with care
New Enlisted Club Construction Photo
12/18/10 - in hope that a pickup soon will be there
New Enlisted Club Construction Photo
12/18/10 - moving the asphalt to the work site
New Enlisted Club Construction Photo
12/18/10 - asphalt is dumped and back for more
New Enlisted Club Construction Photo
12/18/10 - and here comes another load to be added
New Enlisted Club Construction Photo
12/18/10 - discarded plastic had kept concrete warm
New Enlisted Club Construction Photo
12/18/10 - and now the asphalt is being tamped down
New Enlisted Club Construction Photo
12/18/10 - work site in front of Community Center
New Enlisted Club Construction Photo
12/18/10 - wet concrete of new sidewalk reflects images
New Enlisted Club Construction Photo
12/18/10 - heading back to pick up more concrete
New Enlisted Club Construction Photo
12/18/10 - worker smoothes the new concrete
New Enlisted Club Construction Photo
12/18/10 - across the way, a new monument goes up
New Enlisted Club Construction Photo
12/09/10 - snow and cold has slowed construction
New Enlisted Club Construction Photo
12/09/10 - light under plastic prevents freezing
New Enlisted Club Construction Photo
12/09/10 - the area in front of the library
New Enlisted Club Construction Photo
12/09/10 - buried drainpipe partially visible
New Enlisted Club Construction Photo
12/02/10 - revised schedule due to reworking project
New Enlisted Club Construction Photo
12/02/10 - the same work area, new schedule
New Enlisted Club Construction Photo
12/02/10 - removed sections with dirt still on top
New Enlisted Club Construction Photo
12/02/10 - sections awaiting re-installation
New Enlisted Club Construction Photo
12/02/10 - lowering a section into the trench
New Enlisted Club Construction Photo
12/02/10 - looking back at the same work crew
New Enlisted Club Construction Photo
12/02/10 - area in front of library has been completed
New Enlisted Club Construction Photo
12/02/10 - also complete near shopping mall parking
New Enlisted Club Construction Photo
11/23/10 - the roadside closure supporting the new enlisted club is seen here in front of the theater,
taken the day after the planned completion date of this project
New Enlisted Club Construction Photo
11/23/10 - entrance to shopping mall parking
New Enlisted Club Construction Photo
11/23/10 - road between shopping mall and library
New Enlisted Club Construction Photo
11/23/10 - exit from libarary parking lot
New Enlisted Club Construction Photo
11/23/10 - area in front of Community Center
New Enlisted Club Construction Photo
11/23/10 - torn up sidewalk along front of future club
New Enlisted Club Construction Photo
11/23/10 - opening in fence where connection will be made
New Enlisted Club Construction Photo
11/23/10 - looking back towards the shopping mall
New Enlisted Club Construction Photo
11/23/10 - view of new club construction from officers club
New Enlisted Club Construction Photo
11/23/10 - here's an update view with more of the forms removed to expose the bare concrete,
and the girders at the top remain about the same as the previous view
New Enlisted Club Construction Photo
11/16/10 - this is the sign at the 4-way stop near teen center
New Enlisted Club Construction Photo
11/16/10 - overview of construction location
New Enlisted Club Construction Photo
11/16/10 - high-capacity sewer pipe sections at left
New Enlisted Club Construction Photo
11/16/10 - old corrugated pipe sections at right
New Enlisted Club Construction Photo
11/16/10 - working in front of Community Center
New Enlisted Club Construction Photo
11/16/10 - Songtan Blvd closed down to intersection
New Enlisted Club Construction Photo
11/16/10 - some work has to be done by hand
New Enlisted Club Construction Photo
11/16/10 - shopping mall at left, theater at center-right
New Enlisted Club Construction Photo
11/16/10 - there has been little to see of the building construction because the form have been blocking the view,
but now you can see the forms are being removed starting at the left
New Enlisted Club Construction Photo
11/16/10 - passing the construction vehicle entrance
New Enlisted Club Construction Photo
11/16/10 - exposed concrete and removing excess dirt
New Enlisted Club Construction Photo
11/16/10 - this will be one of the back doors of the club
New Enlisted Club Construction Photo
11/16/10 - another future back door at the left
New Enlisted Club Construction Photo
11/16/10 - construction materials stored in the building
New Enlisted Club Construction Photo
11/16/10 - view through temporary opening for machine
New Enlisted Club Construction Photo
11/16/10 - another view of materials stored inside
New Enlisted Club Construction Photo
11/16/10 - forms on ground indicate more concrete work
New Enlisted Club Construction Photo
10/26/10 - less than a week has passed since the last update and major vertical work is now seen.
The Turumi Lodge is almost completely blocked from view and concrete pour should start soon.
New Enlisted Club Construction Photo
10/21/10 - a week later and the final layer of concrete now fully encases the horizontal rebar.
Rebar and vertical forms have been emplaced starting at the left to hold the concrete for the start of wall construction.
New Enlisted Club Construction Photo
10/14/10 - rebar has been installed throughout the new club foundation and concrete laid over the dirt
as the progress continues to finish the foundation and start the vertical work.
New Enlisted Club Construction Photo
10/05/10 - just five days later and after weekend rain, progress continues with fill to go over the dirt and under the concrete.
The area just to the right of center looks interesting. It has a non-standard shape, like an entertainment area.
New Enlisted Club Construction Photo
9/30/10 - with dirt fill added, reinforcing bar now outlines the layout of the club's floor plan, room by room
and it looks like concrete is being laid starting at the left side, maybe covered in plastic to let it cure slowly.
New Enlisted Club Construction Photo
9/14/10 - the man in the blue shirt with the orange hose looks like he's involved in draining the accumulated rainwater,
while the man to the right sitting on the concrete foundation wall looks like he's taking a break from working on the same task.
New Enlisted Club Construction Photo
9/05/10 - the construction crew is back to work trying to pack in as much backfill as they can before
the next typhoon hits Osan, with the clouds starting to darken as I write this caption.
New Enlisted Club Construction Photo
8/31/10 - there's been a significant amount of rain in this post-monsoon period, but that doesn't seem to have slowed construction.
I wanted to get this update before the next typhoon comes through this area, and it's scheduled to hit us two days from now.
New Enlisted Club Construction Photo
8/19/10 - a lot of vertical progress with concrete is visible since the last look two weeks ago.
The progress continues despite high humidity and high temperatures.
New Enlisted Club Construction Photo
8/19/10 - here's a ground-level view of the site to give you a different perspective.
Notice across the lot is that they've started stacking the construction 'office' boxes.
New Enlisted Club Construction Photo
8/19/10 - from the leftmost corner of the photo at left.
New Enlisted Club Construction Photo
8/03/10 - a new view shows the rebar in the previous photo has now been encased in concrete and more forms
and rebar continue the march to the right as the club footing starts to take shape.
New Enlisted Club Construction Photo
7/27/10 - here's an update showing more reinforcing bar being installed at the left and general progress elsewhere.
The haze at the left side of the image is caused by water vapor blowing up from the air conditioning units.
New Enlisted Club Construction Photo
7/15/10 - so much for predictions of monsoon rains delaying the construction as the monsoon front
has hung around mostly off the southern coast leaving dry ground and generally clear skies in the Osan AB area.
New Enlisted Club Construction Photo
7/03/10 - well, as predicted, the monsoon rains have started as shown here
and progress will be slow until the rains stop and the ground dries a bit.
New Enlisted Club Construction Photo
7/01/10 - considerable progress has been made in the month since the last photo
as work progresses over the entire site. However, monsoon starts this weekend.
New Enlisted Club Construction Photo
5/30/10 - if you compare this photo, taken two months after the previous one below,
it's clear that the spring rains are slowing down the construction.
New Enlisted Club Construction Photo
3/28/10 - and the rain continues to stymie any chance to pour concrete
so the focus of work continues at the left side, but without concrete.
New Enlisted Club Construction Photo
3/18/10 - more rain slowed construction again as seen in the water-filled holes
that are supposed to contain the concrete main supports. Some work is being done at the left.
New Enlisted Club Construction Photo
3/04/10 - the recent rains stopped construction for awhile and resulted in
each of the main support holes filled with water and looking like mini swimming pools.
New Enlisted Club Construction Photo
2/02/10 - considerable progress has been made with more precipitation-free days,
and the weather, though still wintry, has been amenable with fewer work interruptions.
New Enlisted Club Construction Photo
1/12/10 - the falling temperatures have brought construction to a halt. With morning temperature
about -16°C (around 3°F), and with snow on the ground, work has stopped for the safety of the workers.
New Enlisted Club Construction Photo
12/28/09 - the cold weather doesn't seem to have slowed workers in front of conex to the right of the dirt pile.
When they started work this morning, the temperature was about -11°C (around 12°F) but they press on.
New Enlisted Club Construction Photo
12/16/09 - holes have been dug and forms put in for the footings that will be poured.
The moutain of dirt covered by netting is best viewed at ground level.
New Enlisted Club Construction Photo
12/16/09 - this is a view from the Community Center side
New Enlisted Club Construction Photo
12/16/09 - another view from the Community Center side
New Enlisted Club Construction Photo
12/16/09 - artist's concept drawing of the finished club
New Enlisted Club Construction Photo
12/16/09 - construction details and planned completion date
New Enlisted Club Construction Photo
12/05/09 - some work is being done on Officers Club side
New Enlisted Club Construction Photo
12/05/09 - wind-driven snow does not stop the work
New Enlisted Club Construction Photo
12/05/09 - cloths on mud reduce tracking mud out of site just a bit
New Enlisted Club Construction Photo
12/05/09 - these machines await their new tasking
New Enlisted Club Construction Photo
11/30/09 - contruction has begun in earnest as can be seen here with the pilings going in to establish a solid foundation.
This overview lets you see the eventual size of the building as seen by placement of pilings.
New Enlisted Club Construction Photo
11/30/09 - large machine to drill holes for the pilings
New Enlisted Club Construction Photo
11/30/09- recent rain results in drill bit covered in mud
New Enlisted Club Construction Photo
11/30/09 - the area where the back of the new club will be
New Enlisted Club Construction Photo
11/30/09 - another view of the drilling machine
New Enlisted Club Construction Photo
10/29/09 - the new Challenger Enlisted Club construction has finally begun with a fence around the site.
Expect good coverage as this is right next to Bldg 936 where the Retiree Activities Office is located.
New Challenger Club Construction Photo
9/07/08 - the new Challenger Club is still dormant, although some site preparation
is going on at the left where utilities connections are being made
New Challenger Club Construction Photo
7/13/08 - the new Challenger Club will be built on this site next to the new Community Center;
and the bare soil probably caused part of the drainage problem shown below

McPherson Community Center

Community Center Construction Photo
7/13/08 - the new McPherson Community Center opened last week
celebrating the event with a ribbon-cutting ceremony
Community Center Construction Photo
7/13/08 - a view of the front entrance to the new center
Community Center Construction Photo
7/13/08 - heavy rain overnight clogged this new drain
Community Center Construction Photo
7/13/08 - clogged drain caused the water to overflow
Community Center Construction Photo
7/13/08 - the overflow washed away newly-installed sod
Community Center Construction Photo
7/13/08 - and mud washed all the way down to Broadway
Community Center Construction Photo
5/25/08 - view of ongoing construction from chapel area
Community Center Construction Photo
5/25/08 - the Community Center has been exposed
Community Center Construction Photo
5/25/08 - landscaping and finishing work needed in front
 
Community Center Construction Photo
5/25/08 - the construction fence has been removed in front of the Community Center
offering a good view of the facility and its environs
Community Center Construction Photo
4/29/08 - a view of the Community Center and the now-cleared open area making my previous W-A-G
about future use on Challenger Club construction way wrong. It was probably just convenient temporary storage
Community Center Construction Photo
4/29/08 - structure for either trash receptacle or fuel tank
Community Center Construction Photo
4/29/08 - the power source for the facility
Community Center Construction Photo
4/29/08 - ground level view of the Community Center
 
Community Center Construction Photo
4/19/08 - here's the latest visual progress report on the construction of the new Community Center
and the construction materials that will eventually be used for the new Challenger Club
Community Center Construction Photo
3/30/08 - the Community Center construction progress and finishing work inside and out continues;
and the construction materials continue to pile up for the next project here
Community Center Construction Photo
3/09/08 - much of the current work on the Community Center is going on inside, although the front (not visible from here)
is looking nearly complete. Challenger Club will be next in open area, and the likely site for a new parking garage is here
Community Center Construction Photo
2/01/08 - a lot of progress has been made and the building looks closer to final finish
and even more of the construction materials remain stored at the site
Community Center Construction Photo
12/12/07 - the inside layer of the roof has been completed, providing weather protection for work inside.
Roofing has been added atop the six concrete posts.
Community Center Construction Photo
11/17/07 - the building continues to show good progress, with work started on the roof-supporting girders.
Six concrete posts have been erected at the left side.
Community Center Construction Photo
11/17/07 - a closer look at the building itself
Community Center Construction Photo
11/17/07 - roof construction as viewed from Hill 180
   
Community Center Construction Photo
10/27/07 - two weeks later and the building continues its upward progress.
I can't help but wonder about the large open area to the right. Looks large enough for a parking garage.
Community Center Construction Photo
10/14/07 - construction progress continues to benefit from the good weather.
Community Center Construction Photo
10/07/07 - good weather shows the increased pace of construction
reflected in the changes since the last update.
Community Center Construction Photo
9/16/07 - a week later and the rains had continued to keep the construction side inundated.
Coming week will probably be no better with typhoon rains and wind predicted.
Community Center Construction Photo
9/08/07 - this view shows muddy working conditions
Community Center Construction Photo
9/08/07 - vehicle tracks show parking lot was covered
Community Center Construction Photo
9/08/07 - wall removed to accommodate the mud flow
Community Center Construction Photo
9/08/07 - despite rains, foundation work continues
Community Center Construction Photo
9/08/07 - unseasonal rains (post-monsoon) have slowed but not stopped the construction.
A tent has been added at the right to allow workmen to continue some work despite the weather.
Community Center Construction Photo
8/18/07 - the forms for the foundation of the community center building are clearly visible at the left side.
Wonder what will be occupying the large area at the right. A ski jump?
Community Center Construction Photo
7/31/07 - another two weeks since the last photo and more significant progress is seen at the left side
where forms are in place indicating the that construction should be starting soon
Community Center Construction Photo
7/15/07 - this is an early morning photo taken before the construction personnel have arrived
and it provides the opportunity to see the progress over the two weeks since the photo below
Community Center Construction Photo
6/30/07 - lot of change has occurred in the site preparation for the Community Activities Center. Looks like
they're trying to build a mountain in the middle, but it's probably just overcoming drainage problems.
Community Center Construction Photo
6/23/07 - at the left, some of the piers that were inserted have been cut down and stack of "tops" can be seen.
Drainage is a problem and pump is visible at the bottom center of the scene. A high-detail image (1.3 MB) can be viewed here.
Community Center Construction Photo
6/15/07 - an updated look from the Officers Club parking lot at the progress of site preparation for Osan's new
6/15/07 - Community Activities Center (CAC) (compare pilings at left with image of 6/10/07)
Community Center Construction Photo
6/15/07 - a different perspective on the CAC site preparation looking from the second floor side entrance to Building 936,
the Personnel building
Community Center Construction Photo
6/15/07 - the parking area at the rear of the CAC site has been striped and the bumper block have been installed,
so everything's back to normal (sort of)
Community Center Construction Photo
6/15/07 - a view of the cleared site from the Library side
Community Center Construction Photo
6/10/07 - the pile driver has been emplacing concrete poles
for a stable foundation upon which to build.
Community Center Construction Photo
5/26/07 - The site is clean and ready for the site preparation work
of bringing in the utilities to match the new building's needs.
Community Center Construction Photo
5/26/07 - a look at the cleared site; library is at the rear
Community Center Construction Photo
5/26/07 - parking area paving has been completed behind the Community Activities Center site.
The finishing work of installing the concrete stop blocks and painting lines can now proceed.
 
Community Center Construction Photo
5/19/07 - parking area behind CAC construction is repaved
Community Center Construction Photo
5/19/07 - parking will serve the CAC and surrounding buildings
Community Center Construction Photo
5/19/07 - concrete stop blocks for the parking spaces
Community Center Construction Photo
5/19/07 - forms used to make the concrete stop blocks
Community Center Construction Photo
4/28/07 - construction fence has gone up around old BX
Community Center Construction Photo
4/28/07 - the port-a-potty is in place for workers
Community Center Construction Photo
4/28/07 - the old building soon to be removed
Community Center Construction Photo
4/28/07 - digging already started at library end
Community Center Construction Photo
Drawing of the Community Activities Center when finished
Community Center Construction Photo
The contract information with completion date Jun 2008
Community Center Construction Photo
4/28/07 - workmen excavating a part of the parking area
Community Center Construction Photo
4/28/07 - curved designs being dug into the excavated area