DoD Dependent Schools

Middle and High Schools

Osan School Construction Photo
10/17/09 - the renovation of the high school sports field has been completed and the result is really beautiful.
The field is covered with artificial turf to avoid previous problems caused by monsoon rains and poor drainage.
Osan School Construction Photo
8/15/09 - in preparation for the coming school season (and beyond), the sport field behind the high school and
new middle school is being renovated by a Korean contractor. The scheduled closure is described in this sign.
Osan School Construction Photo
6/19/09 - middle school complete, starting at the back
Osan School Construction Photo
6/19/09 - construction at the back was mostly invisible
Osan School Construction Photo
6/19/09 - now we know that it's a combination facility
Osan School Construction Photo
6/19/09 - concrete pad turns out to be bicycle parking
Osan School Construction Photo
6/19/09 - looking across front of multipurpose facility
Osan School Construction Photo
6/19/09 - what was fenced off area is now nicely landscaped
Osan School Construction Photo
6/19/09 - looking across back of multipurpose facility
Osan School Construction Photo
6/19/09 - behind multipurpose facility is basketball/tennis court
Osan School Construction Photo
6/19/09 - here is the entire front view of the middle school
to complete this construction photo series
Osan School Construction Photo
6/19/09 - here's a first look at music school added behind HS
Osan School Construction Photo
6/19/09 - a look inside shows a lot of finishing work remains
Osan School Construction Photo
6/19/09 - a panoramic view of the middle and high schools
to complete the DoDDS school construction series
Osan School Construction Photo
5/17/09 - here's an updated look at the middle school
Osan School Construction Photo
5/17/09 - a view of the school from top of parking garage
Osan School Construction Photo
5/17/09 - closer look at front construction area
Osan School Construction Photo
5/17/09 - concrete pad with stand for something (fuel tank?)
Osan School Construction Photo
5/17/09 - part of the back of the middle school
to show the progess of the construction
Osan School Construction Photo
5/17/09 - another concrete pad with stand for something
Osan School Construction Photo
5/17/09 - an updated look at the gym addition at the back
of the middle school
Osan School Construction Photo
5/17/09 - a side look at the gym addition showing depth
Osan School Construction Photo
2/20/09 - much of the construction fence is removed
to allow a better view of the back of the middle school
Osan School Construction Photo
2/20/09 - view of front of school from parking garage
Osan School Construction Photo
2/01/09 - a panoramic view of the back of the middle school
and landscaping work is progressing
Osan School Construction Photo
2/01/09 - here's a view of the front of the school
Osan School Construction Photo
2/01/09 - after snow melted, workers contended with mud
Osan School Construction Photo
1/02/09 - an update view of the back of the school
Osan School Construction Photo
1/02/09 - worker trying to decipher the plan
Osan School Construction Photo
1/02/09 - front of the school looking better
Osan School Construction Photo
12/14/08 - a view of the middle school seen from
the top of the parking garage
Osan School Construction Photo
12/14/08 - updated view showing roof nearly complete
Osan School Construction Photo
11/30/08 - this is an updated view of the roof seen from Hill 170
Osan School Construction Photo
11/30/08 - the side of the school is showing great progess
Osan School Construction Photo
11/30/08 - circle on front will not be a "Hope" symbol
Osan School Construction Photo
11/11/08 - girders now being installed over roof supports
Osan School Construction Photo
11/11/08 - a view of the side facing Mustang Valley Village
Osan School Construction Photo
11/09/08 - Hill 170 view of middle school construction
Osan School Construction Photo
11/09/08 - a closer look at the work on top shows roof supports in place
with a dividing structure separating a smaller area at the right
Osan School Construction Photo
11/02/08 - a view of the school from across street
Osan School Construction Photo
11/02/08 - view of middle school construction from Songtan Blvd
Osan School Construction Photo
11/02/08 - a more vertical look at the
back of school construction site
Osan School Construction Photo
11/02/08 - the insulation work in progress on side
Osan School Construction Photo
11/02/08 - small part insulation stacked and ready
Osan School Construction Photo
10/25/08 - a view of the school from parking garage
Osan School Construction Photo
10/25/08 - view of middle school construction from Songtan Blvd
Osan School Construction Photo
10/25/08 - looking at the back of school construction site
Osan School Construction Photo
10/25/08 - another view of the back of the school construction
Osan School Construction Photo
9/14/08 - school construction seen from Hill 170
Osan School Construction Photo
9/13/08 - view of middle school construction
Osan School Construction Photo
9/13/08 - closer look at construction at rear
Osan School Construction Photo
9/07/08 - side of middle school facing high school
Osan School Construction Photo
9/07/08 - a sweeping side view of the high school expansion, related bus parking,
middle school construction in the background and the sports field
Osan School Construction Photo
8/24/08 - a long view of the school and parking garage
Osan School Construction Photo
8/24/08 - cramped space and increasing building height
led me to try this vertical pan view (hi-rez image)
Osan School Construction Photo
8/24/08 - side view of the front of the building
Osan School Construction Photo
8/24/08 - one of the infrequent views of the middle school side
nearest the officers dorm Bldg 736
Osan School Construction Photo
8/24/08 - a view of the middle school side
facing the high school
Osan School Construction Photo
8/16/08 - walkway is covered as finish work proceeds
Osan School Construction Photo
8/16/08 - front lawn is almost back to normal
Osan School Construction Photo
8/16/08 - a wider look at the high school addition and the other construction
going on at the rear of the school
Osan School Construction Photo
8/03/08 - another rare look at the high school expansion
that looks like it's nearly completed
Osan School Construction Photo
8/03/08 - completing bus loading area next to school
Osan School Construction Photo
8/03/08 - an update view of the construction site
from the sidewalk near the officers dorm
Osan School Construction Photo
8/03/08 - and a different view from the site entrance
adjacent to the high school
Osan School Construction Photo
8/03/08 - another rare look at the high school expansion
that looks like it's nearly completed
Osan School Construction Photo
8/03/08 - completing bus loading area next to school
Osan School Construction Photo
8/03/08 - start on walkway between parking and school
Osan School Construction Photo
8/03/08 - opposite view of walkway on school side
Osan School Construction Photo
8/03/08 - opening on parking garage to connect to walkway
 
Osan School Construction Photo
6/08/08 - overlooking front construction site
from the sidewalk near the officers dorm
Osan School Construction Photo
6/08/08 - a look back towards rear of the site
Osan School Construction Photo
6/08/08 - the foundation is laid for construction at front
of the middle school construction site
Osan School Construction Photo
6/08/08 - a look a construction at the rear of the site
Osan School Construction Photo
6/08/08 - a view from above at the construction
shown in the above photo
  Osan School Construction Photo
6/08/08 - a rare look at the high school expansion work
Osan School Construction Photo
5/10/08 - a new look at the progress of construction of the middle school
as the vertical construction and expanded foundation work continue
 
Osan School Construction Photo
5/10/08 - overview of middle school construction site
Osan School Construction Photo
5/10/08 - a look from ground level at the construction area near the front of the site
that now gets more attention as the foundation is laid
Osan School Construction Photo
5/04/08 - ground-level view of the middle school construction site taken from the Songtan Blvd.
Equipment at left is seen in first photo below taken in opposite side view from officers dorm
Osan School Construction Photo
5/04/08 - construction equipment busily working
Osan School Construction Photo
5/04/08 - construction equipment busily working
Osan School Construction Photo
5/04/08 - another view looking at the larger area
Osan School Construction Photo
5/04/08 - the area behind and to the left
 
Osan School Construction Photo
3/30/08 - this is a ground-level view of the middle school construction site
taken from the Songtan Blvd. It looks a lot more crowded than view below.
Osan School Construction Photo
3/09/08 - this is a ground-level view of the middle school construction site
taken from the Building 736 BOQ side. The high school is in the background.
Osan School Construction Photo
3/09/08 - overview of middle school site from Songtan Blvd
Osan School Construction Photo
3/09/08 - the footings for the school building (from Bldg 736)
  Osan School Construction Photo
3/09/08 - front of site with parking garage site behind it
Osan School Construction Photo
3/09/08 - more construction going on behind school site
Osan School Construction Photo
3/09/08 - this is going on very close to the enlisted dorms
Osan School Construction Photo
3/09/08 - interesting sign for a sidewalk that's going nowhere
 
Osan School Construction Photo
2/02/08 - installation of the concrete pillars continues at the middle school site
and I'm sure residents of adjacent Bldg 736 BOQ will be happy when it's done
Osan School Construction Photo
2/02/08 - looking down on the construction site from Hill 170
Osan School Construction Photo
2/02/08 - view of site from hole in fence next to Bldg 736
Osan School Construction Photo
2/02/08 - looking down on pillar pounding area from Bldg 736
Osan School Construction Photo
2/02/08 - construction viewed from Bdlg 736
Osan School Construction Photo
12/23/07 - construction at the front of the high school
as the surrounding construction expands
Osan School Construction Photo
12/23/07 - construction at the front of the high school
as the surrounding construction expands
Osan School Construction Photo
12/23/07 - new construction continues at the rear of the high school
and note the bare surface of the sport field at the right rear
Osan School Construction Photo
12/13/07 - front of high school disrupted by construction
Osan School Construction Photo
11/17/07 - site preparation for construction of the middle school continues
adjacent to the high school
Osan School Construction Photo
11/17/07 - from Songtan Blvd to Elementary School
Osan School Construction Photo
11/17/07 - continue straight to school, or right to Commissary
Osan School Construction Photo
11/17/07 - Commissary parking is affected by the construction
Osan School Construction Photo
11/17/07 - Commissary traffic flow is temporarily affected
  Osan School Construction Photo
10/27/07 - middle school construction continues as shown here. Notice the car at the left —
check out this blowup to see who's not carrying his share of the workload.
Osan School Construction Photo
10/27/07 - construction impedes smooth traffic flow
Osan School Construction Photo
10/27/07 - digging is related to middle school construction
Osan School Construction Photo
10/27/07 - elementary school road construction overview
 
Osan School Construction Photo
10/27/07 - here's a closer look at the road construction
and shows that the Elementary School info sign has been relocated
Osan School Construction Photo
10/27/07 - will this event disrupt construction, or vice versa
Osan School Construction Photo
9/16/07 - columns for the middle school are rising at the rear
as the expansion of Osan DoDDS continues
Osan School Construction Photo
8/18/07 - construction overview coming from gate
Osan School Construction Photo
8/18/07 - to the right, there is extensive construction activity near the sports field
as the high school expansion proceeds
Osan School Construction Photo
8/18/07 - rearranging the sidewalk is part of the work
Osan School Construction Photo
8/18/07 - project manager uses portable buildings
Osan School Construction Photo
8/18/07 - temporary buildings such as this being replaced
Osan School Construction Photo
8/18/07 - construction area next to officers' dorm
Osan School Construction Photo
8/19/07 - construction progesses where the middle school will go to the right and the
music facility will go into the area straight back
Osan School Construction Photo
7/31/07 - construction started next to Osan High School
Osan School Construction Photo
7/31/07 - construction will comprise three new structures
Osan School Construction Photo
7/31/07 - an extension will be added to the high school
Osan School Construction Photo
7/31/07 - a middle school and music facility will go here

Parking Garage

Osan Parking Construction Photo
12/14/09 - the next day and a different view of the area
Osan Parking Construction Photo
12/14/09 - more workers were visible on this Monday
Osan Parking Construction Photo
12/14/09 - the man on the platform is welding a support
Osan Parking Construction Photo
12/14/09 - and drainage pipes are being added as seen here
Osan Parking Construction Photo
12/13/09 - updating the progress on lower half of third story
Osan Parking Construction Photo
12/13/09 - worker appears to be inspecting work done
Osan Parking Construction Photo
12/13/09 - a look down the entire length of the area
Osan Parking Construction Photo
12/13/09 - plates to be attached rest against pillars
Osan Parking Construction Photo
12/06/09 - it looks like additional reinforcing is being added
Osan Parking Construction Photo
12/06/09 - steel plates are added to ceiling for attachment
Osan Parking Construction Photo
12/06/09 - then reinforcement is attached to ceiling and post
Osan Parking Construction Photo
12/06/09 - upper half of third story is nearly completed
Osan Parking Construction Photo
12/14/08 - the running track and basketball court seen from a different angle
now that it's open and available for use
Osan Parking Construction Photo
12/14/08 - here's the track distance information
Osan Parking Construction Photo
10/25/08 - the icing on the cake, so to speak, here is the top of the parking garage
consisting of four tennis courts, a basketball court and a track
Osan Parking Construction Photo
10/15/08 - two outside and one inside stairway (shown here)
Osan Parking Construction Photo
10/15/08 - this is the skybridge and stairway to the school
Osan Parking Construction Photo
10/15/08 - looking through the skybridge towards the school
Osan Parking Construction Photo
10/25/08 - some shoppers have started parking inside
Osan Parking Construction Photo
10/16/08 - ramp to parking at front (see at right)
Osan Parking Construction Photo
10/16/08 - extensive sprinkler system througout facility
Osan Parking Construction Photo
10/15/08 - a unisex toilet is available for emergencies
Osan Parking Construction Photo
10/15/08 - an elevator is provided for the handicapped
Osan Parking Construction Photo
10/15/08 - only the ground floor is open, others still closed off
Osan Parking Construction Photo
10/15/08 - this is a big relief for Commissary shoppers
Osan Parking Construction Photo
10/15/08 - the sign gives information on the facility
Osan Parking Construction Photo
10/15/08 - still-closed ramp to upper floor parking areas
Osan Parking Construction Photo
10/15/08 - there's this sign in front of parking garage
Osan Parking Construction Photo
10/15/08 - the railing is completed and painted
Osan Parking Construction Photo
10/15/08 - approaching the parking garage entrance
Osan Parking Construction Photo
10/15/08 - the garage is open to Commissary parking
Osan Parking Construction Photo
10/15/08 - approaching the parking garage entrance
Osan Parking Construction Photo
10/15/08 - the garage is open to Commissary parking
Osan Parking Construction Photo
10/15/08 - only the ground floor is open, others still closed off
Osan Parking Construction Photo
10/15/08 - this is a big relief for Commissary shoppers
Osan Parking Construction Photo
10/12/08 - the sidewalk around the parking garage is nearly complete
and a railing along front sidewalk has been started
Osan Parking Construction Photo
10/12/08 - sidewalk railing on school side is complete
Osan Parking Construction Photo
10/11/08 - view of school construction seen from Hill 170
Osan Parking Construction Photo
10/05/08 - sidewalk on Mustang Village side is done
Osan Parking Construction Photo
10/05/08 - sidewalk on Commissary side is done
Osan Parking Construction Photo
10/05/08 - sidewalk near elem school entrance still in work
Osan Parking Construction Photo
9/14/08 - top of parking garage viewed from Hill 170
Osan Parking Construction Photo
9/13/08 - back of parking garage facing Commissary
Osan Parking Construction Photo
9/13/08 - stairway leading to upper floors
Osan Parking Construction Photo
9/13/08 - information sign inside the stairway
Osan Parking Construction Photo
9/13/08 - sidewalk is starting the take shape
Osan v Construction Photo
9/07/08 - pedestrian overpass as seen heading to main gate
Osan Parking Construction Photo
9/07/08 - walkway as seen returning from main gate
Osan Parking Construction Photo
9/07/08 - scaffolding at side, ready for pickup
Osan Parking Construction Photo
9/07/08 - a look at the current state of construction of the parking garage to serve the Commissary and the schools.
Unevenness of lines is due to photo stitching, not poor construction.
Osan Parking Construction Photo
8/24/08 - the finishing work continues on the outside as the
construction work continues on the other side and top
Osan Parking Construction Photo
8/16/08 - bolted-on stanchions that will support top cover
Osan Parking Construction Photo
8/16/08 - a look at the current state of construction of the parking garage
to serve the Commissary and the schools
Osan Parking Construction Photo
8/16/08 - light at the end of the tunnel is the opposite entrance
Osan Parking Construction Photo
8/03/08 - a look at the current state of construction of the parking garage
to serve the Commissary and the schools
  Osan Parking Construction Photo
8/03/08 - construction company sign ( whatever it means)
Osan Parking Construction Photo
6/28/08 - third floor construction is shown at MVV end of bldg
Osan Parking Construction Photo
6/28/08 - third floor construction proceeds across garage
Osan Parking Construction Photo
6/28/08 - from the opposite side, preparation for
third floor construction has begun
Osan Parking Construction Photo
5/08/08 - the parking garage construction progresses from left to right
as seen in the second floor construction at the left
Osan Parking Construction Photo
6/08/08 - a long view of construction from ground level
Osan Parking Construction Photo
6/08/08 - once again, a different view of the parking garage construction from road to the ROKAF area.
Two workers ...oops ... supervisors take a break at the near end while a crews works away in the distance.
Osan Parking Construction Photo
5/25/08 - workers get early start with cool morning weather
Osan Parking Construction Photo
5/25/08 - MVV residents not enjoying early morning noise
Osan Parking Construction Photo
5/25/08 - the second floor construction is progressing
Osan Parking Construction Photo
5/25/08 - but not for the entire length of the bldg
Osan Parking Construction Photo
5/25/08 - sneaking a peek at the far end through fence
Osan Parking Construction Photo
5/25/08 - a different view of the parking garage construction from road to the ROKAF area.
Three family housing areas and Sr NCO dorm are visible in background
Osan Parking Construction Photo
5/10/08 - a closer look at the parking garage construction with the extensive bracing to support
drying floor above. The wood that was seen being delivered last week has been put to good use
Osan Parking Construction Photo
5/10/08 - this machine was rescuing a stuck forklift
Osan Parking Construction Photo
5/04/08 - materials unloaded, stacked for easy access to site
Osan Parking Construction Photo
5/04/08 - from the opposite side, a wider view of the construction site

Osan Parking Construction Photo
5/04/08 - a wider view of the construction looking down from the ROKAF side
 
Osan Parking Construction Photo
4/19/08 - a ground-level view of the parking garage site, showing the development of the ground level parking.
Osan Parking Construction Photo
4/13/08 - here's a different perspective of the parking garage construction from the ROKAF access road side.
Osan Parking Construction Photo
3/30/08 - perspective view of the parking garage site
Osan Parking Construction Photo
3/30/08 - from the opposite side, a wider view of the construction site

Osan Parking Construction Photo
3/30/08 - a ground-level view of the parking garage site, with limited view because of stacked materials.
Osan Parking Construction Photo
3/09/08 - site stabilization is complete and the footings for the parking garage are being installed.
Osan Parking Construction Photo
1/05/08 - a nice overview of the parking garage site
Osan Parking Construction Photo
1/05/08 - the parking garage construction site as seen from ground level
with high school in the background
Osan Parking Construction Photo
12/23/07 - the site preparation continues for the three-story parking garage
with pile drivers emplacing the concrete posts for a stable foundation
Osan Parking Construction Photo
11/24/07 - traffic is temporarily detoured for unimpeded work
Osan Parking Construction Photo
11/24/07 - the front fence has been temporarily removed to facilitate work
allowing for this look across the entire work site
Osan Parking Construction Photo
7/31/07 - construction has started next to the Osan HS
Osan Parking Construction Photo
7/31/07 - construction will comprise three new structures
Osan Parking Construction Photo
7/31/07 - an extension will be added to the high school
Osan Parking Construction Photo
7/31/07 - a middle school and music facility will go here
Osan Parking Construction Photo
9/16/07 - rain delayed the road reopening more than two weeks
Osan Parking Construction Photo
9/16/07 - Burger King at this location is history as the preparation
for the new three-story parking garage here continues
Osan Parking Construction Photo
9/08/07 - Popeye's is history, only a slab is left
Osan Parking Construction Photo
9/08/07 - Popeye's site now stores construction materials
Osan Parking Construction Photo
9/08/07 - with Popeye's gone, can Burger King be far behind
Osan Parking Construction Photo
9/08/07 - now we have to go where you went
Osan Parking Construction Photo
8/18/07 - lots of work involved in putting in new road
Osan Parking Construction Photo
8/18/07 - looking from the back the site is really busy
Osan Parking Construction Photo
7/31/07 - Popeyes will not be replaced, say "bye-bye, Popeyes" — WRONG!
A mobile Burger King trailer is currently parked at the Shopping Mall. It will be used until the new Burger King dual-food facility is built across from the MiG Alleys Bowling Center

Correction to caption at left: Popeye's will reappear when the new facility is completed.
Osan Parking Construction Photo
7/15/07 - this parking area next to Burger King will go away
Osan Parking Construction Photo
7/31/07 - to make room for the construction of a new access road to the
elementary school, and the road is being moved to make room for a parking garage
Valid XHTML 1.1!