| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Commsite Enlisted Dorm |
|||
|---|---|---|---|
![]() 3/22/09 - work continues on support utilities for dorm |
![]() 3/22/09 - more progess is seen with new sidewalk at front |
![]() 3/22/09 - panoramic view of dorm with softball game taking place on the field in front |
|
![]() 2/21/09 - an updated view of the front of the Commsite dorm with work inside and on grounds mostly not visible |
![]() 2/21/09 - a closer look at the front of the dorm |
![]() 2/21/09 - concrete truck backed in to fill excavator scoop |
|
![]() 1/02/09 - an updated look at the back of the dorm |
![]() 1/02/09 - side door entrance at front of dorm |
![]() 1/02/09 - a view across the front of the building |
![]() 1/02/09 - looking at Commsite across the ballfield |
![]() 1/02/09 - this front panoramic view is very nice coverage showing how much progress had been made towards completion |
![]() 1/02/09 - a bit longer look from near the picnic area |
![]() 1/02/09 - view of Commsite roof from Hill 180 near golf course |
|
![]() 11/08/08 - painting has started on the back of the dorm |
![]() 11/08/08 - and painting is also partially done on front |
![]() 11/08/08 all mortar work over foam has been completed as seen in this overview of the dorm across the ballfield |
|
![]() 9/14/08 - a lot has been accomplished on the outside since the last photo with roof support girders now installed and white styrofoam insulation started |
|||
![]() 9/14/08 - Commsite dorm with adjacent Ballfield dorm |
![]() 9/14/08 - looking a the dorm front across ballfield |
![]() 9/14/08 - styrofoam insulation covers the back |
|
![]() 5/25/08 - the good weather has has a visible effect on this dorm construction topped out |
![]() 5/25/08 - a good look at the dorm from ballfield fenceline |
![]() 5/25/08 - the Commsite dorm with its twin, the Ballfield dorm |
|
![]() 5/04/08 - construction has speeded up with the good weather, with more visible exterior changes until the rainy season starts |
|||
![]() 1/19/08 - great progress has been made vertically since last look more than six months ago |
![]() 1/19/08 - a look at the building from the other end |
![]() 1/19/08 - a peek inside to seek what the workmen are doing |
|
![]() 6/30/07 - a lot of change has taken place at the site to ensure a stable foundation as preparation for construction continues |
|||
![]() 6/10/07 - An updated look at the site preparation for the Commsite dorm, looking from the Gingko Tree Dining Facility side |
|||
![]() 6/10/07 - the pile driver awaits the 0900 signal to start |
![]() 6/10/07 - showing the progress of piles driven to date |
![]() 6/10/07 - the clutter near the front side of the site |
|
![]() 5/27/07 - new Commsite enlisted dorm going up |
![]() 5/27/07 - the newest Osan enlisted dormitory construction gets underway between the Ginko Tree Dining Facility and the ballfields. Piledriver waits until 0900 on this Sunday morning before starting. |
||
![]() 5/27/07 - workers complete drainage work in front of Ginko |
![]() 5/27/07 - looking down on the site drainage work area |
![]() 5/27/07 - looking into new work site from Ginko Tree side |
![]() 5/27/07 - dorm residents with morning hangover will suffer |
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Hill 170 Enlisted Dorms |
|||
![]() 9/21/03 - landscaping is done; building is ready for residents |
![]() 9/21/03 - windows have inner doors to add protection |
![]() 9/21/03 - covered bike rack in back, here's a better view of it |
![]() 9/21/03 - looks from this angle like they're ready for occupancy |
![]() 8/16/03 - the sod grass has been installed and covered |
![]() 8/16/03 - other work includes upgrade to Osan water system |
![]() 7/12/03 - building numbers have been added, now they're official |
![]() 7/4/03 - another look at the nearly finished dorm from left |
![]() 7/4/03 - drainage work is done, ready for landscaping work |
![]() 7/4/03 - white structure at left is chemical filtration system |
![]() 5/31/03 - rear entrance roofs are completed at right building |
![]() 5/18/03 - outside work very visible, new concrete pad at left |
![]() 4/27/03 - all scaffolds removed, outside work proceeds |
![]() 3/29/03 - scaffolding starts to come down from left building |
![]() 2/16/03 - a look at the left building from the left front side |
![]() 2/16/03 - right building wrapped in blue, roof work continues |
![]() 2/2/03 - left building is wrapped in blue, right roof work continues; note the near drainpipe is blocked to allow work on building drains |
![]() 2/2/03 - first look at the front of the left building, from right side |
![]() 12/21/02 - roof work continues on both buildings |
|
![]() 11/23/02 - exterior roof work at left, interior roof work at right |
![]() 10/20/02 - roof goes on the left building, fourth floor at right |
![]() 9/15/02 - third floor interior walls are visible in right building |
![]() 9/7/02 -finishing fourth floor at left, third floor at right |
![]() 8/25/02 - building at right is now ready for third floor |
![]() 8/18/02 - fourth floor starts at left, inside walls go up at right |
![]() 7/27/02 -third floor going up at left, second floor starts at right |
![]() 6/29/02 - second floor goes up at left, interior walls at right |
![]() 6/22/02 - interior walls of right building are being constructed |
![]() 6/16/02 - utility building at rear of left building is visible |
![]() 6/8/02 - left continues upward, right wall forms are in place |
![]() 5/12/02 - left building starts to rise, right foundation is laid |
![]() 4/20/02 - wall forms at left, and foundations at right |
![]() 3/17/02 - living below the water plant, good drainage came first |
![]() Here is an artist's drawing of what the two enlisted dormitories will look like when completed on this site |
|
![]() 3/3/02 - This is the construction site of the two enlisted dormitories to be built here, coming down from the water plant on Hill 170. The thumbnail image shown above is about 75% of the width of the full-size image that can be viewed by clicking on this image. |
|||
![]() 11/03/96 - Building 346 in yet one more phase of its life. |
![]() In 1975, the 51st MMS prepares for the U.S. Bicentennial year. |
From 1985, when I returned to Korea for my "final tour," until 1989, I worked as a contractor for the Constant Watch Program Management Office (CW-PMO). The PMO was responsible for overseeing the construction and equipping of the Hardened Theater Air Control Center (HTACC) and Korea Combined Operations- Intelligence Center (KCOIC). CW-PMO was housed in Building 346, shown in the two images to the left. The building was vacated in 2001 and torn down, along with an adjacent building, to make room for new housing for Osan's enlisted force. (by Jack Terwiel) | |
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Ballfield Enlisted Dorm |
|||
![]() 10/10/04 - the dorm is done and open for residents |
![]() 7/24/04 - the grass on the left ballfield looks great |
![]() 6/26/04 - the spectator and dugout areas of ballfield |
![]() 6/13/04 - from the construction office area, a view of the dorm |
![]() 5/22/04 - dorm residents across from Trans construction |
![]() 5/22/04 - also golf course dorms construction nearby |
![]() 5/22/04 - current residents and ballfield dorm construction |
Walking around taking photos of the construction sites shown here and elsewhere, it occurred to me that the noise, starting at 7am and ending after dusk seven days a week, must be difficult for the residents of existing dorms in this area. Three photos at left show the surrounding construction for enlisted dorm residents here. |
![]() 5/22/04 - rear of dorm shows the utilities building add-on |
![]() 5/22/04 - across the grass of left ballfield, a view of the dorm |
![]() 5/22/04 - a view of the dorm construction from right ballfield |
![]() 2/15/04 - near ballfield done, far ballfield still being worked on |
![]() 2/15/04 - ballfield construction in front of dorm is shaping up |
![]() 12/14/03 - another ballfield perk is expanded parking space |
![]() 12/14/03 - now that the leaves are gone, the dorm is visible |
![]() 10/18/03 - thinner vegetation allows a first view of the dorm |
![]() 10/5/03 - adding spectator seats and other infrastructure |
![]() 9/21/03 - four months later, the ballfields have really shaped up |
![]() 5/4/03 - overlooking picnic area, compare with 4/28/02 photo |
![]() 5/4/03 - spreading vegetation makes good photo more difficult |
![]() 5/4/03 - lots of construction equipment needed for this work |
![]() 5/4/03 - this structure will divide the ballfields |
![]() 3/29/03 - working on ballfields, concrete being poured for dorm |
![]() 3/29/03 - lots of work going on with what's really two projects |
![]() 3/29/03 - the work has started on construction/upgrade |
![]() Here is artist's drawing of new dorm and upgraded ballfields |
![]() 4/28/02 - the Osan recreation area consisting of covered picnic areas and two ballfields, the latter in need of a lot of work |
|
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Golf Course Enlisted Dorms |
|||
![]() 7/23/05 - net minimizes impact of golf balls on new dorms |
![]() 4/24/05 - a look at the impact of new dorms on the golf course |
![]() 3/6/05 - Building 1462 is also ready to accept new residents |
![]() 3/6/05 - Building 1460 is ready to accept new residents |
![]() 3/6/05 - a line of bicycle racks attest the no-driving policy |
![]() 5/22/04 - the Ginko Tree dining facility left, new dorms at rear |
![]() 5/22/04 - the buildings are well along in this photo |
|
![]() 10/5/03 - the buildings start to rise up from the construction site. |
|||
![]() 3/29/03 - the foundation for the new enlisted dormitories are dug. The new route for golf carts is seen skirting construction fence as golfers face the newest hazard. Ball out of bounds takes on new meaning with the construction fence |
|||
![]() 5/19/02 - construction fence appears on the golf course as the newest obstacle faced by Osan duffers. The lush grass will soon be replaced by two new enlisted dormitories as Osan AB strives to meet individual floorspace requirements for the airmen's comfort |
|||
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Osan-ni Enlisted Dorm |
|||
![]() 10/2/05 - 7/23 estimate of "a couple of weeks" was wrong |
![]() 10/2/05 - the building is now nearly ready for occupants |
![]() 10/2/05 - nearby golf course dorms get drainage work |
![]() 10/2/05 - more drainage work across from the Ginko Tree |
![]() 7/23/05 - the Osan-ni dormitory is nearing completion with opening in a couple of weeks. The major efforts now appear to be concentrating on the landscaping and final cleanup |
![]() 7/23/05 - work proceeds at the end nearest the golf course |
||
![]() 7/16/05 - the outside landscape work is also being completed |
![]() 7/16/05 - one of the items being cleaned out is the office space |
![]() 7/16/05 - the crane truck shows up to start site cleanup |
![]() 5/29/05 - exterior construction is finished, inside work goes on |
![]() 3/6/05 - new dormitory is same design as the ballfield dorm |
![]() 5/22/04 - the foundation work is nearly complete |
![]() 5/22/04 - the dormitory will house 156 persons |
![]() A new enlisted dormitory will be constructed on the Osan-ni site |
![]() 10/5/02 - with AAFES gone, teardown can begin |
![]() 3/17/02 - the former Osan-ni Dining Facility was replaced by the Ginko Tree Dining Facility. The building then was used to temporarily house AAFES facilities such as Four Seasons and Class VI |
||
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Readiness Enlisted Dorm |
|||
![]() 1/19/08 - Readiness Dorm is complete and occupied |
![]() 1/19/08 - a look at the rear from near the Mustang Club |
![]() 1/19/08 - covered patio makes for comfortable barbequing |
![]() 1/19/08 - a side view of the rear area with supporting equipment |
![]() 6/30/07 - painting has been completed on the building |
![]() 6/30/07 - painters' scaffolding is still in place at the back |
![]() 6/30/07 - painters' scaffolding also in place at the front |
![]() 6/30/07 - new entrance to the building takes shape |
![]() 6/10/07 - view of Readiness Dorm from Mustang Club |
![]() 6/10/07 - not much change except paint at top right |
![]() 6/10/07 - paint has been applied to top floor |
|
![]() 5/27/07 - updated look at progress of construction |
![]() 5/27/07 - air filtration appropriate for this dorm's mission |
![]() 5/27/07 - workmen apply concrete over white insulation |
![]() 5/27/07 - workmen depart after installing insulation on inner roof |
![]() 2/10/07 - removing some scaffolding at Readiness dorm |
![]() 2/10/07 - workmen at 2nd window with crane cables near |
![]() 2/10/07 - workman at 3rd window continues disassembly |
![]() 2/10/07 - the cables and pipes hang out from the window |
![]() 2/10/07 - crane starts to pull disassembled pipes out |
![]() 2/10/07 - pipe bundle swings free from the window |
![]() 2/10/07 - pipes start their journey to the next scaffold job |
![]() 2/10/07 - nearby drainage work across from Ginko Tree |
![]() 1/21/07 - an updated look at the Readiness dorm |
![]() 1/21/07 - another view from the vicinity of the golf course |
![]() 1/21/07 - workmen bring more supplies up using elevator |
![]() 1/21/07 - a close look at the elvator and entry to the building |
![]() 12/31/06 - New dorm stands tall against blue sky |
![]() 12/31/06 - workman unloads steel 2x4s from elevator |
![]() 12/31/06 - another workmen on elevator is helping |
![]() 12/31/06 - another view from rear to compare with earlier one |
![]() 11/26/06 - Readiness dorm as seen from near Mustang Club |
![]() 11/26/06 - a closer look at the rear of the building |
![]() 11/26/06 - workmen on scaffolds install foam insulation |
![]() 11/26/06 - this structure is not evident in 6/3/06 drawing below |
![]() 8/19/06 - construction progress as sixth floor is reached |
![]() 8/19/06 - a look at the back construction area |
![]() 8/19/06 - the ramp system doesn't seem to be keeping up |
![]() 8/19/06 - ah yes, an elevator is faster and more convenient |
![]() 7/8/06 - a longer look at the entrance to the new dormitory |
![]() 7/8/06 - the building continues upward in view from back |
![]() 7/8/06 - an overview of the materiels storage at the site |
![]() 7/8/06 - additional art added to improve outside appearance |
![]() 6/3/06 - artist's concept of what Readiness Dorm will look like |
![]() 6/3/06 - entrance to site of Readiness Dorm construction |
![]() 6/3/06 - looking down at the back of the construction site |
![]() 6/3/06 - elaborate ramp system to get materials to upper floors |
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
Building 746 Enlisted Dorm Repair |
|||
![]() 6/26/04 - work is complete, including rooftop air handlers |
![]() 5/22/04 - work nears completion and ready for re-occupancy |
![]() 2/15/04 - behind the trees, scaffolding can still be seen |
|
![]() 12/27/03 - external repairs done, work inside continues |
![]() 9/21/03 - the empty building undergoes massive renovation |
In the summer of 2003, Building 746, a Civil Engineer Sq enlisted dormitory, was struck by fire |
![]() 3/29/03 - Bldg 746 is dwarfed by the Turumi Lodge behind it |
| Commsite Dorm | Two Dorms on Hill 170 | Ballfield Dorm | Two Dorms on Golf Course |
| Osan-ni Dorm | Readiness Dorm | Bldg 746 Fire Damage Repair | |
![]() |
|||