New Passenger Terminal |
|||
|---|---|---|---|
![]() 3/07/09 - another look from the 'hole in the fence' at the progress viewed in this panoramic image of the side of the terminal |
![]() 3/07/09 - the building to the right of the terminal |
||
![]() 2/21/09 - an updated look at the terminal front from afar |
![]() 2/21/09 - a portion of the cloth fencing had been lowered allowing for this first-time panoramic view of the side of the terminal |
||
![]() 11/17/09 - the previous panoramic view comment said you couldn't get a feel for the size of the new terminal so here's a full-width, double-height panoramic view of it to get a better idea of the size |
|||
![]() 12/14/08 - the terminal has really grown since our last look at it and this photo really doesn't give a feel for how big it really is |
![]() 12/14/08 - this is a separate building adjacent to terminal |
||
![]() 11/11/08 - this is an updated view showing the progress of construction, with installation of the roof now proceeding. A concrete truck entered just before this photo and can be seen at the right in the distance in front of another u/c building |
|||
![]() 10/25/08 - terminal peeks up enough to see from bus term |
![]() 10/25/08 - here's a fresh look at the progress of construction of the new terminal and the beautiful autumn weather continues to contribute to the speed of the work |
||
![]() (left) 10/05/08 - this is an updated view showing the progress of construction, now with second floor scaffolding installation begun. (right) 10/12/08 - with airshow access to the flightline, taking a panoramic series doesn't work well holding camera above 6ft fence |
|||
![]() 9/14/08 - photo taken under closed gate on Chuseok holiday |
![]() 9/07/08 - an updated view on the progress of construction for the new Passenger Terminal showing further progress |
![]() 9/07/08 - a closer look at side where workers are visible |
|
![]() 8/24/08 - an updated view on the progress of construction for the new Passenger Terminal with autumn weather bringing ideal weather for outdoor work |
![]() 8/24/08 - good thing Osan AB Fire Department is nearby |
||
![]() 8/03/08 - an updated view on the progress of construction for the new Passenger Terminal as the monsoon season has ended but the typhoon season continues to bring rain |
|||
![]() 8/03/08 - across from new terminal is World Airways office |
![]() 8/03/08 - it's in a building that's not very large |
![]() 8/03/08 - and World shares the building with Trans-Pacific |
![]() 8/03/08 - so you can really say it's a small World, after all |
![]() 7/13/08 - an updated view on the progress of construction as the monsoon season slows construction of the new Passenger Terminal |
|||
![]() 6/28/08 - an artist's concept of new Passenger Terminal |
![]() 6/28/08 - construction sign with completion date in 2010 |
![]() 6/28/08 - Korean sign shows cost about US $14 million |
![]() 6/28/08 - shown in early stage, here's the construction site |
Civil Engineering Administration |
|||
![]() 3/22/09 - much of the concrete has been broken up in preparation for replacement and new curbing can be seen in front of the building |
|||
![]() 3/07/09 - most of the visible work at the front of the building is on the preparations for landscaping and finishing the parking area |
|||
![]() 3/07/09 - an updated view of right side of building |
![]() 3/07/09 - this is an updated view of the left side of the CE building, the side facing the bus terminal and road to the passenger terminal |
||
![]() 2/21/09 - here's and updated view of the front of the CE Administration building. Note the symmetry with the back of the building in the adjacent photo |
![]() 2/21/09 - and here's a view of the back of the building |
||
![]() 2/21/09 - this is a panoramic view of the right side (as viewed from the front) showing the extent of progress (previous views misidentified this as the back) |
|||
![]() 2/21/09 - this is a view of the left side of the building with workmen at the left doing some of the finishing work |
|||
![]() 1/17/09 - the building is looking more complete outside |
![]() 1/17/09 - and work has started to prepare the grounds |
![]() 1/17/09 - even the area to the left is being cleaned up |
|
![]() 11/11/08 - an overview image of the CE building from Broadway |
![]() 11/11/08 - looks like the old concrete pad is being removed |
![]() 11/11/08 - foam insulation is being installed on the back, but it might be hard to see the bricks covering the lower part |
|
![]() 11/11/08 - a good view of the rear and the side of the building and drainage work being done on this side of fence |
|||
![]() 10/05/08 - an overview image of the CE building from Broadway |
![]() 10/05/08 - an updated view on the progress of construction for the new CE building |
![]() 10/05/08 - a closer look at rear and side of the building |
|
![]() 9/07/08 - construction continues on the CE building and this photo shows progress at the rear of the building |
|||
![]() 8/16/08 - the most recent photo to show you the progress of construction on the CE Administration Building |
|||
![]() 8/03/08 - the most recent photo to show you the progress of construction on the CE Administration Building |
![]() 8/03/08 - a view of building from the rear |
||
![]() 6/28/08 - Here is an update photo to show the progress of construction on the CE Administration Building |
![]() 6/28/08 - nearby CE Mongrel awaits rest of CE to join them |
||
![]() 5/25/08 - Here is a photo showing the progress of construction on the CE Administration Building The good weather continues to provide excellent working conditiions for speedy completion |
|||
![]() 5/10/08 - here is the latest view of the construction site on a beautiful Spring day ideal for construction work. The one-armed man (standing at right end of building) appears to have lost his arm to photo editing rather than to accident |
|||
![]() 5/04/08 - here is the latest view of the construction site for the new CE Administration Building. Expect accelerated construction until the rainy season arrives |
|||
![]() 4/19/08 - at this point, the form of the building is now evident in the foundation. Man in foreground is compressing soil around the foundation |
|||
![]() 4/05/08 - with the much improved weather conditions, the contruction has gone into high gear. The reinforcing bars for the building columns now appear |
|||
![]() 2/02/08 - a lot of change happening very rapidly as the good (but cold) weather lets the workmen press on with the site preparation |
|||
![]() 1/26/08 - the supporting pillars are being very noisily pounded into the ground to ensure the building is stable on soil of questionable stability |
|||
![]() 12/23/07 - a new CE admin building is going up at Osan |
![]() 12/23/07 - and this is what it will look like when completed |
![]() 12/23/07 - it will be built where the 554th Red Horse Squadron used to be and adjacent to the Osan AB bus terminal |
|
![]() 12/23/07 - Red Horse is gone and the site preparation has begun to build the new facility |
|||
Leadership School |
|||
![]() 6/25/05 - the finished top of the leadership school |
![]() 6/25/05 - another view of the exterior |
![]() 6/25/05 - workmen start their day; I followed them |
|
![]() 6/25/05 - looking from the front to the rear entrance |
![]() 6/25/05 - the screen last seen on 5/29/05 is now in place |
![]() 6/25/05 - the entrance from the Education Center building side |
|
![]() 6/19/05 - the exterior should be just about finished |
![]() 6/19/05 - stucco has been applied to the walls |
![]() 6/19/05 - the education center entrance nearest the school |
![]() 6/19/05 - inside the education center, the effect of construction |
![]() 5/29/05 - the roof of the Leadership School is in place |
![]() 5/29/05 - a look at construction from ground level |
![]() 5/29/05 - "stuff" noted on 5/16 is a wide screen display |
![]() 5/16/05 - U/I structure taking shape as Leadership School |
![]() 5/16/05 - new stuff going in, this end closed the following day |
![]() 5/7/05 - stepped structure for seats like in a theater |
![]() 4/23/05 - the area next to Chili's progresses slowly |
![]() 4/23/05 - next to construction is break area for Turumi guests |
![]() 4/3/05 - here's an update photo of construction next to Chili's |
![]() 3/6/05 - the construction next to Chili's continues |
![]() 2/12/05 - the construction next to Chili's remains a mystery |
![]() 1/30/05 - a U/I pad construction between Ed Center and Chili's |
Traffic Management Office |
|||
![]() 7/4/05 - on an overcast morning, a look at the new TMO fence |
![]() 7/4/05 - a closer looks at the fence while it's still shiny |
![]() 7/4/05 - fence is electrically grounded, as shown here |
![]() 7/4/05 - as gate shows, fence construction is not done yet |
![]() 7/4/05 - a look at Customer Service across the parking lot |
![]() 7/4/05 - a remnant of the past role of the parking lot |
||
![]() 6/25/05 - fence installers arrive to secure the loading area |
![]() 6/25/05 - the customer parking area nearly finished |
![]() 6/25/05 - workers install the stop blocks for parking places |
![]() 6/25/05 - hot work on a humid, day and time for a break |
![]() 6/19/05 - yet one more look at the main TMO building |
![]() 6/19/05 - the remaining area to be paved is ready for asphalt |
![]() 6/19/05 - the parking area for the customer service building |
![]() 6/19/05 - a look at customer parking and customer service |
![]() 6/12/05 - preparing the parking area for paving |
![]() 6/12/05 - the sod is in and looks really good |
![]() 5/29/05 - the customer service building is in use |
![]() 5/29/05 - because the old customer service is gone |
![]() 5/29/05 - where the old customer service was will be parking area |
![]() 4/23/05 - the new customer service building is nearly ready |
![]() 4/23/05 - but the old customer service is still in use |
![]() 4/23/05 - the new TMO building is not quite finished |
![]() 12/11/04 - The TMO building nears completion |
![]() 12/11/04 - the new TMO customer service building |
![]() 12/11/04 - for comparison, here is the current custom service |
![]() 9/25/04 - the current state of construction from the left side |
![]() 9/25/04 - the current state of construction from the left side |
![]() 7/10/04 - a look at the TMO building on a foggy Sat morning |
![]() 6/26/04 - the current state of construction from the left side |
![]() 6/13/04 - the current state of construction from the left side |
![]() 5/22/04 - the framework is up for the new TMO building |
![]() 5/22/04 - the TMO loading dock at the Osan railhead |
![]() 11/10/03 - parking and equipment area has been paved |
![]() 11/10/03 - vertical construction at the loading dock |
![]() 10/18/03 - TMO loading dock construction in progress |
![]() 9/21/03 - work starts on the reconstruction of Traffic Mgt |
![]() 9/21/03 - construction sign for new Traffic Management Office |
|
Transportation Maintenance |
|||
![]() 6/10/07 - update on the status of the Trans fishpond |
![]() 6/10/07 - it's looking pretty good, still pumping water |
![]() 6/10/07 - but the water doesn't look very healthy |
![]() 6/10/07 - are these shadows or fish in the murky water? |
![]() 6/03/06 - the parking area is very big to hold large vehicles |
![]() 6/03/06 - here is the completed building last noted in January |
![]() 6/03/06 - the drainage channel has been cleaned up since Nov |
|
![]() 6/03/06 - small goldfish have been added to the still-dirty pond |
![]() 6/03/06 - white fish swims on back, which fish don't do |
![]() 5/03/06 - a 5-6" turtle has been added to scavenge dead fish |
|
![]() 1/14/06 - workers clean up around the vehicle entrance |
![]() 1/14/06 - view of building from the rear, the lights are on |
![]() 1/14/06 - workers dig holes for posts to hold new gates to area |
![]() 1/14/06 - work proceeds on a new fence to protect resources |
![]() 12/24/05 - continuing the contruction on the new building |
![]() 12/24/05 - the big door indicates it will house maintenance |
![]() 12/24/05 - a better look at the rear of the building |
![]() 12/24/05 - workers benefit from good (but cold) weather |
![]() 12/24/05 - water was turned off, but not the pump |
![]() 12/24/05 - blue? Was this healthy for the fish? |
||
![]() 11/05/05 - roof going onto new Transportation building |
![]() 11/05/05 - a look at the new building from the back |
![]() 11/0/05 - a closer look at the rear of the building |
![]() 11/05/05 - improved drainage is part of the construction |
![]() 11/05/05 - more water is now flowing in the fishless pond |
The remaining live fish sighted last week is gone. As shown in the photo at left, more water flow has been added to increase aeration and filtering. |
![]() 11/05/05 - a hose disappears into the murky depth, no fish yet |
|
![]() 10/15/05 - more construction going on behind Mustang Club |
![]() 10/15/05 - the water wheel continues to function |
![]() 10/15/05 - some vegitation has been added |
![]() 10/15/05 - fish added again, but one didn't make it |
![]() 7/16/05 - the Transportation building is fully functioning now |
![]() 7/16/05 - a Korean man inspects the water wheel, pond |
![]() 7/16/05 - he's checking five fish (koi) he just put into pond |
![]() 4/28/02 - here is the water wheel three years ago |
![]() 5/29/05 - a panoramic view of new Transportation building |
![]() 4/24/05 - for those familiar with Trans, water wheel is still here |
||
![]() 4/24/05 - update photo of the front of Trans building |
![]() 3/6/05 - looking at new Trans building from A-10 display site |
![]() 6/13/04 - view from the temp post office give idea of size |
![]() 10/5/03 - construction sign for new Transportation building |
![]() 5/22/04 - the construction of the new Transportation building starts to become visible from outside |
![]() 10/5/03 - the artist's drawing of the Transportation building site |
||
Temporary Passenger Terminal |
|||
![]() 2/25/06 - foreshortened AMC Passenger Terminal now open |
![]() 10/16/05 - a better look at the damaged terminal |
![]() 10/16/05 - a close-up look at the damaged area |
![]() 10/15/05 - a first look at the AMC Terminal damage |
![]() 10/15/05 - temporary terminal now has a sign |
![]() 6/19/05 - a look at the temporary passenger terminal (old BX) |
![]() 6/19/05 - taxi stand is now for smokers and baggage carts |
![]() 6/19/05 - a look across from right to left, counters at right |
![]() 6/19/05 - a look across from left to right |
![]() 6/19/05 - main terminal waiting area has lots of seating |
![]() 6/19/05 - departure lounge is isolated from rest of terminal |
|
![]() |
|||