United Services Organization (USO) |
|||
|---|---|---|---|
![]() 12/14/08 - come in the main gate and make a right turn |
![]() 12/14/08 - from the road you can see a new sign peeking up |
![]() 12/14/08 - it's the new location of the USO (roof sign is lighted) |
|
Roller Hockey Court |
|||
![]() 10/27/07 - the expensive Skateboard Park shown below has been transformed into a Roller Hockey Court. I suspect that someone finally noticed the Skateboard Park went virtually unused after the initial flurry. |
|||
Skateboard Park |
|||
![]() 8/16/03 - a large investment has converted the tennis court into a Skateboard Park. It's hoped that this facility will reduce the damage caused by skateboarding in customer service areas. |
|||
| United Services Organization (USO) | Roller Hockey Court | ||
| Chili's | Checkertails | Golf Course Clubhouse | |
Chili's |
|||
![]() 4/22/06 - a look at Chili's with landscaping completed |
![]() 4/22/06 - from theater side, artistic designs |
![]() 4/22/06 - pedestrian pathway as seen from Turumi Lodge side |
![]() 4/22/06 - the overview shows the result of force protection |
![]() 3/18/06 - Chili's opened for business on March 16 |
![]() 3/18/06 - with business booming, so is trash removal |
![]() 3/18/06 - the sidewalk veers right next to entrance |
![]() 3/18/06 - force protection landscaping on left side |
![]() 3/4/06 - still some finishing work to be completed outside |
![]() 3/4/06 - close-up now that contractor fence is removed |
![]() 3/4/06 - much work remains to finish theater side |
![]() 3/4/06 - a first look at front from gound level |
![]() 2/18/06 - opening in March, are you ready? |
![]() 218/06 - finishing up, lot of trash from unpacking |
![]() 2/18/06 - attractive enclosures, finishing the sidewalk |
![]() 2/18/06 - how to get to Chili's from the Turumi Lodge |
![]() 1/30/06 - from above, more outside work completed |
![]() 1/30/06 - the back area where deliveries will be made |
![]() 1/30/06 - a look at the sidewalk lighting on theater side |
![]() 1/30/06 - from the front, inside finish work is visible |
![]() 1/08/06 - an updated look at Chilis from above |
![]() 1/08/06 - down at ground level, the left side |
![]() 1/08/06 - also at ground level, the back of the building |
![]() 1/08/06 - here's the front of the building, not much change |
![]() 12/24/05Here's about how Chili's will look when finished |
![]() 12/24/05 - here's a look at Chili's from above |
![]() 12/24/05 - another closeup of ToGo to compare progress |
![]() 12/24/05 - a look from ground level, theater side |
![]() Here's Chili's new sign as seen from across the street |
![]() 12/4/05 - here's a look at Chili's on a chilly day |
![]() 12/4/05 - preparing the driveway for delivery trucks |
![]() 12/4/05 - looks like preparation for a maintenance sidewalk |
![]() 12/4/05 - covered power box added near air handlers |
![]() 11/27/05 - some more progress is visible on the building |
![]() 11/27/05 - the delivery pickup entrance for Chilis-To-Go |
![]() 11/27/05 - update on construction shown last week |
![]() Osanites will be seeing this sign before too long |
![]() 11/20/05 - here's a look at the new sign from Hill 180 |
![]() 11/20/05 - lights and awning frames installed on the side |
![]() 11/20/05 - air considitioning with protective housing going up |
![]() 10/30/05 - a ground-level peek at theater side of Chili's |
![]() 10/15/05 - here's an update to show the site progess |
![]() 10/15/05 - last week's construction, this week's curb |
![]() 10/15/05 - I wondered about dark spots above windows ... |
![]() 10/15/05 - ... and discovered they're mount points for lights |
![]() 10/9/05 - here's an update taken with the new camera |
![]() 10/9/05 - zooming in on construction at front |
![]() 10/9/05 - a better view of the front from library |
![]() 10/9/05 - another test of the camera's 12X zoom capability |
![]() 10/2/05 - an update showing the left side |
![]() 10/2/05 - a look at the rear area of the building |
![]() 10/2/05 - finally an idea of what the front will look like |
![]() 7/16/05 - here's a first-time look from ground level at the rear area in total. Workmen were inside preparing for today's efforts |
|||
![]() 7/16/05 - not much visible progress, working inside |
![]() 7/4/05 - an updated look at the progress of construction |
![]() 7/4/05 - here's a first look at the construction from ground level |
![]() 6/25/05 - some progress visible on roof work |
![]() 6/25/05 - the top structure is still enshrouded |
![]() 6/19/05 - a look at the overall progress of construction |
![]() 6/19/05 - the top is completely enshrouded now |
![]() 6/19/05 - a look at the construction from a lower level |
![]() 6/12/05 - an inner steel lining can be seen below roof girders |
![]() 6/12/05 - a decorative top structure is being added |
![]() 6/12/05 - a look at the visible part from the library side |
![]() 5/29/05 - Chili's work shows progress as roof is started |
![]() 5/16/05 - here's an update on the progress of Chili's |
![]() 5/7/05 - Chili's has made real progress in two week |
![]() 5/7/05 - another look from a lower level |
![]() 4/23/05 - Chili's now has a floor with subsurface work done |
![]() 4/16/05 - an update on the subsurface preparations |
![]() 4/3/05 - the walls that will contain the utilities are visible |
![]() 3/19/05 - forms now removed show the concrete supports |
![]() 3/6/05 - forms are shown to prepare to pour the supports |
![]() 2/12/05 - not much progess showing at Chili's |
![]() 1/30/05 - the footings are now in so Chili's won't sink |
![]() 1/15/05 - Chili's work site is starting to show activity |
![]() 12/11/04 - Chili's site, not much progress in a year |
![]() 10/23/04 - the construction fence is up, so work should being soon |
![]() 3/27/04 - the future site of Chili's is where the photo lab was |
![]() 10/18/03 - the front of what was the photo lab |
![]() 10/18/03 - the rear of what was the photo lab |
| United Services Organization (USO) | Roller Hockey Court | ||
| Chili's | Checkertails | Golf Course Clubhouse | |
Checkertails |
|||
![]() 10/14/07 - Checkertails is being expanded |
![]() 10/27/07 - front view of Checkertails construction |
![]() 10/14/07 - peeking through the fence at the construction |
![]() 10/14/07 - better view of the same thing over the fence |
![]() 7/4/05 - across from the new mall parking is Checkertails |
![]() 7/4/05 - it's open 24/7 and convenient to airport buses |
![]() 7/4/05 - so while you're waiting, grab something good to eat |
![]() 7/4/05 - and enjoy it outside when the weather is good |
![]() 7/4/05 - Checkertails shares the building with Tour & Travel |
![]() 7/4/05 - and there's a slots room for those so inclined |
||
| United Services Organization (USO) | Roller Hockey Court | ||
| Chili's | Checkertails | Golf Course Clubhouse | |
New Golf Clubhouse |
|||
![]() 1/26/08 - overflow parking for members and guests |
![]() 1/26/08 - the new driving range is next to overflow parking |
![]() 1/26/08 - driving range is full-size for all woods and irons |
![]() 1/26/08 - equipped with adequate practice positions |
![]() 1/26/08 - equipment to support driving range contests |
![]() 1/26/08 - vending machines dispense practice balls |
![]() 1/26/08 - rest rooms adjacent to the driving range, but no stairs |
|
![]() 1/26/08 - a view of the driving range from outside |
![]() 1/26/08 - driving range parking lot, also overflow for club |
![]() 1/26/08 - next to driving range is 18th hole water hazard |
![]() 1/26/08 - atop the thin layer of ice, frozen golf balls |
![]() 1/26/08 - original roadway from aircraft hangarette area |
![]() 1/26/08 - now the road had a curve to the left |
![]() 1/26/08 - new road between clubhouse and driving range |
![]() 1/26/08 - parking entrance is where old road was before |
![]() 1/19/08 - the Lakes of Osan sign has been relocated |
![]() 1/19/08 - this is the clubhouse end of the facility |
![]() 1/19/08 - this is the side housing the clubhouse |
![]() 1/19/08 - on the opposite side is the Oriental House |
![]() 1/21/07 - new construction site spotted on the golf course |
![]() 1/21/07 - new golf clubhouse due for completion in Sep 2007 |
![]() 1/21/07 - construction started on new golf clubhouse |
![]() 1/21/07 - current clubhouse, its days are numbered |