Morale, Welfare and Recreation

United Services Organization (USO)

MWR Construction Photo
12/14/08 - come in the main gate and make a right turn
MWR Construction Photo
12/14/08 - from the road you can see a new sign peeking up
MWR Construction Photo
12/14/08 - it's the new location of the USO (roof sign is lighted)

Roller Hockey Court

MWR Construction Photo
10/27/07 - the expensive Skateboard Park shown below has been transformed into a Roller Hockey Court.
I suspect that someone finally noticed the Skateboard Park went virtually unused after the initial flurry.

Skateboard Park

MWR Construction Photo
8/16/03 - a large investment has converted the tennis court into a Skateboard Park.
It's hoped that this facility will reduce the damage caused by skateboarding in customer service areas.

Chili's

MWR Construction Photo
4/22/06 - a look at Chili's with landscaping completed
MWR Construction Photo
4/22/06 - from theater side, artistic designs
MWR Construction Photo
4/22/06 - pedestrian pathway as seen from Turumi Lodge side
MWR Construction Photo
4/22/06 - the overview shows the result of force protection
MWR Construction Photo
3/18/06 - Chili's opened for business on March 16
MWR Construction Photo
3/18/06 - with business booming, so is trash removal
MWR Construction Photo
3/18/06 - the sidewalk veers right next to entrance
MWR Construction Photo
3/18/06 - force protection landscaping on left side
MWR Construction Photo
3/4/06 - still some finishing work to be completed outside
MWR Construction Photo
3/4/06 - close-up now that contractor fence is removed
MWR Construction Photo
3/4/06 - much work remains to finish theater side
MWR Construction Photo
3/4/06 - a first look at front from gound level
MWR Construction Photo
2/18/06 - opening in March, are you ready?
MWR Construction Photo
218/06 - finishing up, lot of trash from unpacking
MWR Construction Photo
2/18/06 - attractive enclosures, finishing the sidewalk
MWR Construction Photo
2/18/06 - how to get to Chili's from the Turumi Lodge
MWR Construction Photo
1/30/06 - from above, more outside work completed
MWR Construction Photo
1/30/06 - the back area where deliveries will be made
MWR Construction Photo
1/30/06 - a look at the sidewalk lighting on theater side
MWR Construction Photo
1/30/06 - from the front, inside finish work is visible
MWR Construction Photo
1/08/06 - an updated look at Chilis from above
MWR Construction Photo
1/08/06 - down at ground level, the left side
MWR Construction Photo
1/08/06 - also at ground level, the back of the building
MWR Construction Photo
1/08/06 - here's the front of the building, not much change
MWR Construction Photo
12/24/05Here's about how Chili's will look when finished
MWR Construction Photo
12/24/05 - here's a look at Chili's from above
MWR Construction Photo
12/24/05 - another closeup of ToGo to compare progress
MWR Construction Photo
12/24/05 - a look from ground level, theater side
MWR Construction Photo
Here's Chili's new sign as seen from across the street
MWR Construction Photo
12/4/05 - here's a look at Chili's on a chilly day
MWR Construction Photo
12/4/05 - preparing the driveway for delivery trucks
MWR Construction Photo
12/4/05 - looks like preparation for a maintenance sidewalk
MWR Construction Photo
12/4/05 - covered power box added near air handlers
MWR Construction Photo
11/27/05 - some more progress is visible on the building
MWR Construction Photo
11/27/05 - the delivery pickup entrance for Chilis-To-Go
MWR Construction Photo
11/27/05 - update on construction shown last week

MWR Construction Photo

Osanites will be seeing this sign before too long
MWR Construction Photo
11/20/05 - here's a look at the new sign from Hill 180
MWR Construction Photo
11/20/05 - lights and awning frames installed on the side
MWR Construction Photo
11/20/05 - air considitioning with protective housing going up
MWR Construction Photo
10/30/05 - a ground-level peek at theater side of Chili's
MWR Construction Photo
10/15/05 - here's an update to show the site progess
MWR Construction Photo
10/15/05 - last week's construction, this week's curb
MWR Construction Photo
10/15/05 - I wondered about dark spots above windows ...
MWR Construction Photo
10/15/05 - ... and discovered they're mount points for lights
MWR Construction Photo
10/9/05 - here's an update taken with the new camera
MWR Construction Photo
10/9/05 - zooming in on construction at front
MWR Construction Photo
10/9/05 - a better view of the front from library
MWR Construction Photo
10/9/05 - another test of the camera's 12X zoom capability
MWR Construction Photo
10/2/05 - an update showing the left side
MWR Construction Photo
10/2/05 - a look at the rear area of the building
MWR Construction Photo
10/2/05 - finally an idea of what the front will look like
MWR Construction Photo
7/16/05 - here's a first-time look from ground level at the rear area in total. Workmen were inside preparing for today's efforts
MWR Construction Photo
7/16/05 - not much visible progress, working inside
MWR Construction Photo
7/4/05 - an updated look at the progress of construction
MWR Construction Photo
7/4/05 - here's a first look at the construction from ground level
MWR Construction Photo
6/25/05 - some progress visible on roof work
MWR Construction Photo
6/25/05 - the top structure is still enshrouded
MWR Construction Photo
6/19/05 - a look at the overall progress of construction
MWR Construction Photo
6/19/05 - the top is completely enshrouded now
MWR Construction Photo
6/19/05 - a look at the construction from a lower level
MWR Construction Photo
6/12/05 - an inner steel lining can be seen below roof girders
MWR Construction Photo
6/12/05 - a decorative top structure is being added
MWR Construction Photo
6/12/05 - a look at the visible part from the library side
MWR Construction Photo
5/29/05 - Chili's work shows progress as roof is started
MWR Construction Photo
5/16/05 - here's an update on the progress of Chili's
MWR Construction Photo
5/7/05 - Chili's has made real progress in two week
MWR Construction Photo
5/7/05 - another look from a lower level
MWR Construction Photo
4/23/05 - Chili's now has a floor with subsurface work done
MWR Construction Photo
4/16/05 - an update on the subsurface preparations
MWR Construction Photo
4/3/05 - the walls that will contain the utilities are visible
MWR Construction Photo
3/19/05 - forms now removed show the concrete supports
MWR Construction Photo
3/6/05 - forms are shown to prepare to pour the supports
MWR Construction Photo
2/12/05 - not much progess showing at Chili's
MWR Construction Photo
1/30/05 - the footings are now in so Chili's won't sink
MWR Construction Photo
1/15/05 - Chili's work site is starting to show activity
MWR Construction Photo
12/11/04 - Chili's site, not much progress in a year
MWR Construction Photo
10/23/04 - the construction fence is up, so work should being soon
MWR Construction Photo
3/27/04 - the future site of Chili's is where the photo lab was
MWR Construction Photo
10/18/03 - the front of what was the photo lab
MWR Construction Photo
10/18/03 - the rear of what was the photo lab

Checkertails

MWR Construction Photo
10/14/07 - Checkertails is being expanded
MWR Construction Photo
10/27/07 - front view of Checkertails construction
MWR Construction Photo
10/14/07 - peeking through the fence at the construction
MWR Construction Photo
10/14/07 - better view of the same thing over the fence
MWR Construction Photo
7/4/05 - across from the new mall parking is Checkertails
MWR Construction Photo
7/4/05 - it's open 24/7 and convenient to airport buses
MWR Construction Photo
7/4/05 - so while you're waiting, grab something good to eat
MWR Construction Photo
7/4/05 - and enjoy it outside when the weather is good
MWR Construction Photo
7/4/05 - Checkertails shares the building with Tour & Travel
MWR Construction Photo
7/4/05 - and there's a slots room for those so inclined
   

New Golf Clubhouse

MWR Construction Photo
1/26/08 - overflow parking for members and guests
MWR Construction Photo
1/26/08 - the new driving range is next to overflow parking
MWR Construction Photo
1/26/08 - driving range is full-size for all woods and irons
MWR Construction Photo
1/26/08 - equipped with adequate practice positions
MWR Construction Photo
1/26/08 - equipment to support driving range contests
MWR Construction Photo
1/26/08 - vending machines dispense practice balls
MWR Construction Photo
1/26/08 - rest rooms adjacent to the driving range, but no stairs
 
MWR Construction Photo
1/26/08 - a view of the driving range from outside
MWR Construction Photo
1/26/08 - driving range parking lot, also overflow for club
MWR Construction Photo
1/26/08 - next to driving range is 18th hole water hazard
MWR Construction Photo
1/26/08 - atop the thin layer of ice, frozen golf balls
MWR Construction Photo
1/26/08 - original roadway from aircraft hangarette area
MWR Construction Photo
1/26/08 - now the road had a curve to the left
MWR Construction Photo
1/26/08 - new road between clubhouse and driving range
MWR Construction Photo
1/26/08 - parking entrance is where old road was before
MWR Construction Photo
1/19/08 - the Lakes of Osan sign has been relocated
MWR Construction Photo
1/19/08 - this is the clubhouse end of the facility
MWR Construction Photo
1/19/08 - this is the side housing the clubhouse
MWR Construction Photo
1/19/08 - on the opposite side is the Oriental House
MWR Construction Photo
1/21/07 - new construction site spotted on the golf course
MWR Construction Photo
1/21/07 - new golf clubhouse due for completion in Sep 2007
MWR Construction Photo
1/21/07 - construction started on new golf clubhouse
MWR Construction Photo
1/21/07 - current clubhouse, its days are numbered